Ref no. |
Organisation |
Scheme |
Scheme cost |
Amount requested |
Adjusted amount |
% of cost requested |
Suggested score |
SCAP21-22/57 |
Crowmarsh Parish Council |
Improving Crowmarsh Pavilion Facilities |
£148,016 |
£74,008 |
£73,016 reduced based on organisation’s contribution |
49.33% |
28 |
SCAP21-22/65 |
Watlington Parish Council |
Multi Use Games Area (MUGA) |
£227,543 |
£75,000 |
|
32.96% |
24 |
SCAP21-22/55 |
Sonning Common Parish Council |
Lighting the MUGA and pathway at Memorial Park |
£112,732 |
£56,366 |
|
50.00% |
22 |
SCAP21-22/61 |
Millstream Day centre |
Benson Millstream Centre Extension and Refurbishment |
£124,424 |
£29,678 |
|
23.85% |
22 |
SCAP21-22/74 |
Holton Village Hall |
Sound System and Hearing Loop system for Village Hall |
£7,028 |
£3,000 |
|
42.69% |
21 |
SCAP21-22/82 |
SOFEA |
Installation of training kitchen |
£99,661* Original total project cost £111,270 |
£24,000 |
|
24.08% |
20 |
SCAP21-22/64 |
Wheatley Parochial Church Council |
Revival at St Mary's |
£623,160 |
£75,000 |
|
12.04% |
19 |
SCAP21-22/77 |
Chinnor RFC - Thame |
Clubhouse Extension |
£175,387 |
£74,887 |
|
42.70% |
19 |
SCAP21-22/53 |
Long Wittenham Athletic Club |
Pavilion Extension |
£72,160 |
£36,080 |
|
50.00% |
17 |
SCAP21-22/71 |
Culham Parish Council |
Culham recreation ground renewal and extension |
£89,408 |
£44,704 |
|
50.00% |
17 |
SCAP21-22/76 |
Thame Shed |
The insulation of Thame Shed |
£7,740 |
£7,740 |
£3,870* applied for 100% of project cost |
50.00% |
16 |
SCAP21-22/70 |
Woodcote Parish Council |
New pathway on village green |
£48,250 |
£24,125 |
|
50.00% |
14 |
SCAP21-22/75 |
Goring & Almshouses Bowls Club |
Upgrade and expansion of bowling green |
£24,162 |
£9,000 |
|
37.25% |
14 |
SCAP21-22/69 |
Sonning Common and District Tennis Club |
Tennis court resurfacing x 2 |
£31,777 |
£9,990 |
|
31.44% |
14 |
SCAP21-22/49 |
Berinsfield Information and Volunteer Centre |
Upgrade printer |
£5,885 |
£5,885 |
£2,942.50* applied for 100% of project costs |
50.00% |
8 |
SCAP21-22/52 |
Aston Rowant Parish Council |
Parish noticeboards |
£6,563 |
£5,000 |
£3,281.50* applied for 76% of project costs |
50.00% |
6 |
Officer recommended award levels (budget permitting) *adjusted figure to fit scheme’s criteria |
|
Total Requested
£554,463 |
Total Requested (adjusted) £544,940
|
Total Suggested
£320,000 |
Budget
£320,000
|
Scoring and award matrix for Capital Grant applications
SCORE |
PRIORITY LEVEL |
AWARDS (all awards are subject to sufficient budget. Medium priorities will only receive funding if there is budget left after all the high priority projects are awarded). |
21-30 points |
High priority |
Award full amount requested - budget permitting - Capped at 50 per cent of the cost unless we allow a request for more and they meet the criteria for an exception. |
15-20 points |
Medium priority |
Award between 50 and 75 per cent of the amount requested, depending on the score - budget permitting |
0-14 points |
Low priority |
No funding awarded |
CROSS-CUTTING CRITERIA – ALL PROJECTS TO BE SCORED AGAINST THESE
Community need, inclusion, and consultation
Scoring guidance – The council wishes to support projects aimed at improving community well-being and resilience to recover from the pandemic as well as providing new activities or facilities. We also wish to prioritise those projects which encourage access for all and help meet the council’s equality objectives. To achieve the highest point within each section, we would like to see evidence that stakeholder consultation and/or an accessibility audit has been carried out to establish the level of need for the project.
Should there be other similar facilities available in the local area, emphasis should be placed on providing evidence that there is sufficient demand within the community to support this work.
Points |
Criteria to score |
Project examples |
0 |
The project did not involve consultation with stakeholders, and no evidence of need, new activities or improvement to existing activities has been provided |
A decorative village sign that will be mainly used for people outside of the community or doesn’t allow any community activities to take place nor give the community a facility to use. |
1-2 |
(1 point) Little additional use/improvement will be gained as a result of the project e.g the project replaces existing facilities or allows existing activities to continue. Or The project moderately improves a minor community facility or activity.
(2 points) AS ABOVE AND Some consultation has taken place.
|
It replaces furniture in the village hall with like-for-like replacements. No consideration has been given to providing more accessible furniture (higher chairs with backs and arm rests)
Replacing like-for-like playground equipment without consultation for how the space could be improved to enable more users or provide more inclusive play equipment.
A decision to undertake the project has been taken at committee level with little detail of how existing users or wider community have been consulted.
|
3-4 |
(3 points) The project moderately improves or extends a substantial community facility or activity. or The project significantly improves or extends a minor community facility or activity. or The project provides a new minor facility or activity for the community.
(4 points) AS ABOVE AND Consultation has been carried out with existing users but no evidence to suggest this has been done with the wider community.
|
Replacing existing park benches with longer-lasting accessible ones, replacing the chairs in the village hall with more comfortable accessible ones or improve a play area to cater for more ages.
Refurbishment of changing rooms to increase capacity and accessibility for disabled and mobility impaired people (e.g. disabled toilets, handrails, accessible changing rooms)
Increase club participation by purchasing boats for a small canoeing club or increasing the size of a playing area providing some new equipment.
Feedback has been formally invited from members via a survey or AGM. Some evidence of informal feedback from users of the facility would score less points.
|
5-6 |
(5 points) The project will provide substantial new facilities or activities to the community. or The project significantly improves the capacity of a significant community facility.
(6 points) AS ABOVE AND Substantial consultation has been carried out with the community/other stakeholders, including minority groups if project impacts on them.
|
Creating a brand-new play area where there wasn’t one already which takes into consideration all users and provides inclusive equipment. (e.g. equipment for disabled children, sensory equipment, wheelchair accessible paths, accessible seating and picnic benches)
Adding a large extension to a village hall that is accessible to all. If not already part of the building also considers disabled and mobility impaired users, people of small stature (e.g. disabled parking, accessible kitchen space, disabled toilet, wheelchair accessible doorways/ramps/entrance and egress)
The significant reorganisation of a facility to increase capacity where full consideration has been given to all users including those that are disabled or mobility impaired.
Creation of a new sporting facility such as Multi Use Games Area, pavilion or playing pitch that meets the needs of all members of the community including disabled and mobility impaired people.
An accessibly audit has been completed and changes to the project have been adopted to improve access to all.
Every effort has been made to invite all members of the community and stakeholders to provide feedback through a formal survey, AGM or open days. The organisation has identified minority groups in the community and delivered targeted communication to encourage participation. Improvement of facility is included in the local plan or leisure facility strategy (or similar)
|
Deductions |
- Deduct one point if the project reduces the activities/facilities on offer - Deduct two points if the project removes a community facility or stops existing activities taking place. In addition, the panel can recommend not funding a project if they have serious concerns around the management of the project now or in the future, or serious concerns about the appropriateness of the project e.g. should it become apparent that the community don’t support the project or would prefer a different solution
|
A project to overhaul and landscape a car park that reduces the number of parking spaces or disabled parking spaces.
Demolishing an old skatepark without replacing it with anything. |
Community benefit
Scoring guidance – This scoring criteria focusses on the groups or communities who will directly use the facility/take part in the project. To achieve the highest point in each section, projects should demonstrate that they are either benefiting a greater number of residents when compared to other projects in the same category, or specifically improving access for vulnerable people and priority groups, which may include – note this is not an exhaustive or a definitive list- the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments.
Action on Climate Emergency
Scoring guidance – this criteria is not intended to be used to score against the climate actions taken within the project itself, but to recognise the applicant’s commitment to climate action in general, and how they may make positive contributions to the climate emergency in other areas of their work/organisation.
Points |
Climate Action overview |
Example |
0 |
The organisation has given limited consideration to the climate emergency.
|
|
1-2 |
(1 point) The organisation has given some consideration into possible actions that address the Climate Emergency, with limited evidence of any actions undertaken.
(2 points) The organisation has delivered one-off or minor events or activities that contribute to the Climate Emergency
|
Such as research into improving the energy efficiency of building/organisation operations, or research into promotion of waste minimisation
Such as replacing some lightbulbs with energy efficient ones, installing bike racks, implementing an energy smart meter, hosting a climate themed coffee morning. |
3-4 |
(3 points) The organisation has implemented multiple or regular minor events, activities or services that contribute to the Climate Emergency
(4 points) AS ABOVE AND Adoption of a simple sustainability/ climate action policy/statement for the organisation
|
Such as replacing all lightbulbs with energy efficient ones, use of local suppliers/plant-based foods for events and activities, providing a cycle to work scheme, regularly hosting climate themed coffee mornings that produce outcomes |
5-6 |
(5 points) The organisation has implemented multiple Climate Emergency related events, activities or services as routine part of the organisation’s workplan, and have a sustainability/ climate policy showing a high-level commitment by the organisation to addressing the climate emergency
(6 points) AS ABOVE AND have a sustainability / climate action forward plan or strategy for the organisation |
Such as energy audit of premise(s) commissioned and investment in recommendations, staff/volunteer training on climate literacy, engagement with partners on sustainability programmes in the community |
Finance Sustainability
Scoring guidance – Officers will be looking for a sound fundraising plan with contingencies should any of their grant applications (to the council and others) be unsuccessful or receive less than requested.
Competition for funds mean that organisations which still have a large fundraising liability and will have to provide substantial evidence to give confidence that the project will be seen through to completion within the accepted project timeframe. Therefore, organisations are strongly encouraged to seek additional funding from elsewhere before applying to the council. To achieve the highest point in each section, we would expect to see evidence that the applicant has included ongoing maintenance costs and eventual replacement.
Points |
Financial overview |
0 |
They don’t have a plan of how they’ll fund the rest of the project and haven’t secured any other funding yet.
They haven’t given details of how they’ll fund the ongoing maintenance and eventual replacements. |
1-2 |
(1 point) They’ve got a funding plan but haven’t applied for all of it yet. or They’ve applied for all the other funding needed but have secured less than 50 per cent so far.
(2 points) AS ABOVE AND They’ve also budgeted for the ongoing maintenance but don’t say how they’ll fund eventual replacements in the future (if applicable). |
3-4 |
(3 points) They’ve applied for all the funding needed and have already secured 50 per cent or more of the balance, including contingency funding should some of their applications be unsuccessful or partially successful.
(4 points) AS ABOVE AND They’ve also budgeted for the ongoing costs and have a general idea how they’ll fund replacements eventually (if applicable) |
5-6 |
(5 points) They've secured all the other funding needed for the project already (including if they’re funding the rest themselves) and have a contingency plan should they only receive a partial grant from the council. or The organisation has requested 100 per cent of the cost and have provided evidence that they’ve lost a funder, can’t raise money themselves (e.g via precept) and can’t apply for other grants/funding.
(6 points) AS ABOVE AND They’ve also budgeted for the ongoing costs and have a fund/account/pot saving for the replacements in due course. |
Deductions |
- Deduct one point if the organisation’s finances suggest they could contribute towards the cost - Deduct two points if they can afford the whole project without any funding.
Even if an application scores enough points, the panel can recommend not funding the project if has serious concerns about its financial viability, such as if the organisation has not demonstrated having a sound fundraising plan with contingencies should any of their grant applications (to the council and others) be unsuccessful or award less than requested.
|
THEMED CRITERIA – PROJECTS SCORED AGAINST ONE OF THE FOLLOWING
Scoring guidelines – The application will be marked against ONE of the following sections, depending on which of the four outward facing corporate plan priorities the applicant categorises the project under:
This section scores each project against the same set of criteria, which recognises improved outcomes for the community through specific, measurable targets. We are also looking for evidence of relevant partnership working and collaboration in project delivery.
Points |
Criteria to score |
0 |
Response is not relevant to the priority theme and/or is not a key outcome of the presented project.
The information given does not provide the officer with confidence that the project will result in better outcomes for the community.
No information regarding partnership working or community engagement has been offered. |
1-2 |
(1 point) Relevant response that addresses how a capital grant will provide better outcomes to the community at an acceptable standard.
The theme has been considered in a minor way, but the information provided lacks some detail. Outputs have been identified, rather than outcomes considered, with more detail needed for how this will be measured.
(2 points) AS ABOVE AND Some information regarding minor partnership working or community engagement has been provided. |
3-4 |
(3 points) Clear and relevant response that addresses how a capital grant will provide better outcomes to the community at a good standard under the specific theme.
The theme has been considered in a major way with some key measurable outcomes identified.
(4 points) AS ABOVE AND Good examples of partnership working regarding project delivery, including examples of collaborations with other organisations and/or the community. |
5-6 |
(5 points) Clear, relevant, and well detailed responses that addresses how a capital grant will provide better, measurable outcomes to the community at an excellent standard under the specific theme.
Goes above expectations and fully integrates the project theme into the project plan and outcomes.
(6 points) AS ABOVE AND Clearly sets out how they will work in partnership at all levels of project delivery to meet the corporate plan priority and how partner organisations and/or the community have been involved in project planning and implementation. |
Project examples under each theme
Points |
Protect and restore our natural world |
Improved economic and community wellbeing |
Homes and infrastructure that meet local need |
Action on the Climate Emergency |
0 |
Tree planting projects without evidence of landowner permission or commitment to long-term maintenance of the planting. Tree planting or habitat creation projects on unsuitable sites – all projects should involve some form of initial ecological survey to ensure the right trees (or other habitats) are being planted in the right place (i.e. not planting trees on existing wildflower meadows) Projects which have involved no consultation and have not obtained baseline information from the Thames Valley Environmental Records Centre. |
Projects that fall under another thematic area and/or meet the unsatisfactory criteria. |
Projects that fall under another thematic area and/or meet the unsatisfactory criteria. |
A project to upgrade toilet facilities does not include energy saving features such as light sensors A boiler is replaced with a more efficient one but only meeting building regulations |
1-2 |
Projects involving only small areas with only minimal biodiversity and community benefit. No community or volunteer involvement.
Small scale tree or hedgerow planting with little wider benefit and not following relevant local or national priorities. |
New office equipment related to community transport schemes that reduces rural isolation. New furniture for advice services that help to improve mental health.
The installation of a Defibrillator to improve a community’s physical wellbeing.
Improvements to an existing social enterprise which promotes economic recovery such as community shop or community pub, but the project does not result in any new activities taking place (e.g. replacement of windows from single to double glazing) |
Projects to encourage sustainable transport and reduce car dependency in a new housing development but are replacing an existing facility with a like-for-like design (e.g. replacing cycle storage, no additional capacity) |
Minor investment in energy efficiency leading to reduced energy bills. Lighting or insulation in one area e.g kitchen. Draught proofing installed in a building. A timer or smart metre is added to heating controls
Minor projects to help adapt to climate change e.g. water saving taps and urinals measured by reduced water consumption Minor sustainable transport projects e.g. cycle racks resulting in some evidence of behaviour change
Equipment for projects that promote the circular economy (reuse and repair of goods and materials) e.g. IT equipment, storage, kitchen fixtures and fittings. |
3-4 |
Medium scale projects evidencing good community involvement and a commitment to partnership working. Projects or proposals fitting in with relevant local and national priorities. This might for example include planting a small woodland or creating wetlands in an appropriate location working with local volunteers and not-for-profit organisations. Projects well designed with evidence of consultation with relevant bodies. |
Facilities that encourage culture, leisure and art to promote social wellbeing (e.g. expansion of sports facilities, creation of public arts, purchasing of village hall staging, theatre refurbishment) Building refurbishment costs for organisations that support vulnerable people (e.g. those with disabilities or to improve mental health) Refurbishment of a facility that improves social isolation and deprivation (e.g. Buildings that hold advice and debt services. befriending services, good neighbour schemes, volunteer driver schemes, food banks). Improvements to an existing social enterprise that will allow for the expansion of services or for new services to take place. (e.g. a community shop expanding to carry more stock which meets local demand or a community pub adding café facilities to enable longer opening hours for the community to meet and reduce social isolation) |
Refurbishing empty community properties for the benefit of the community/not residential (e.g. refurbishing a community hub for young families, refurbishing a building that houses charitable organisations supporting vulnerable people) Improving green space facilities that are accessible for all in a new housing development. (e.g. signage, creating private footpaths, fencing, planting, benches accessible for mobility impaired people) Projects to encourage sustainable transport and reduce car dependency by working with the community to upgrade already existing cycle storage in a new housing development to allow more bikes and better protection. |
Investment in building energy efficiency using more than one technology eg LED lighting with lighting controls, insulation, a building management system measured by a good reduction in energy bills Projects to help adapt to climate change eg solar shading and water saving measures
|
5-6 |
Large scale habitat creation/restoration projects or tree planting projects forming a key part of meeting relevant local and national priorities. Projects that evidence widespread consultation/partnership working and careful planning to ensure the project is creating the right habitats in the right place.
Projects that have thoroughly considered the long-term sustainability of the proposals and evidence how ongoing management and maintenance will be provided for. High quality proposals which are fully costed demonstrating value for money alongside an appropriate specification. |
Projects that promote economic recovery and quality employment through the creation of a new social enterprise such as a community shop or pub that will result in new job creation and/or create volunteer training opportunities that could provide future employment opportunities for local residents
Projects that help create new long term, sustainable funding opportunities for the organisation (e.g. refurbishment of a community centre that includes a volunteer run café) Creation of a new facility that improves social isolation and deprivation (e.g. A new building that will house advice and debt services, food banks, befriending services.) |
Projects that create new and improved infrastructure for communities in a new developments to promote cohesion and that are accessible to all (e.g. village halls, playgrounds, outdoor gyms, sports facilities) Creating new accessible green spaces in partnership with local organisations to ensure that all members of the community can access the space to improve physical and mental wellbeing (e.g. purchase of land with accessible pathways, extensive planting and facilities such as benches) Projects that actively promote sustainable transport and reduce car dependency by creating a new substantial cycle storage facility that meets the needs of the community and promotes sustainable methods of transport to the wider community. |
Projects to help achieve significant carbon emission savings for organisations/facilities e.g. investment in renewable technologies such as solar energy and heat pumps Substantial investment in building energy efficiency such as full lighting retrofit, upgraded loft and wall insulation measured by a significant reduction in energy bills A project ensures energy saving measures are a high-profile feature of the facility, with energy monitors in public areas and information about the savings clearly visible and attractive manner to users Substantial project for a community facility to help adapt to climate change e.g rainwater harvesting system or substantial sustainable transport projects e.g electric car charging points Creation of a permanent community run facility that promotes the circular economy (reuse and repair of goods and materials) e.g Repair cafe, refill centre |
Crowmarsh Parish Council |
Ref |
SCAP21-22/57 |
||
Improving Crowmarsh Pavilion Facilities |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 1,140 |
||||
|
||||
Total project cost |
£148,016 |
SCAP grant requested |
£73,016* |
|
Organisation's contribution |
£75,000 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£0 |
*Originally requested £74,008 but adjusted based on organisation’s contribution. |
||
Funding still needed for the project |
£73,016 |
Organisation's latest bank balance £292,083.09 |
||
Previous community grants awarded: SCap18-19\23 New Crowmarsh Play Area and Outdoor Gym £99,790 (2018)
Scoring |
|||
Community need, inclusion and consultation The project significantly improves the capacity of an important community facility by improving the accessibility of the pavilion and maximising community use. Two of the existing changing rooms will be turned into a new meeting room with adjacent servery and independent access. Accessible toilets will be built, new windows fitted and a new terrace installed. Consultation has been carried out with existing users of the site alongside other stakeholders. |
Score |
6/6 |
|
Community benefit The pavilion is a facility that is accessible for all (there is no membership) and is used by sports clubs, children's activities and special interest groups. The facility will be used by a greater number of residents compared to other projects in the same category. The proposed improvements will allow more flexibility in the use of the building and will enable multiple activities to take place at the same time and in doing so, further increase the number of beneficiaries. |
Score |
6/6 |
|
Action on Climate Emergency The organisation demonstrates a high-level commitment to address the climate emergency and supports the Climate and Ecological Emergency Bill. They have submitted evidence of their Sustainability and Climate Change policy and sustainability statement which outlines their forward plans. They have implemented multiple Climate Emergency related events, activities or services as a routine part of the organisation’s workplan. |
Score |
6/6 |
|
Financial sustainability The applicant is requesting 50 per cent of total project cost, matched by a donation of up to £75,000 from the Parish Council's CIL money. The Parish Council will cover ongoing maintenance and any replacements. They have a contingency plan should they only receive a partial grant from the council. |
Score |
6/6 |
|
Themed criteria for chosen corporate plan priority By expanding this community facility, the pavilion will increase social, sport and leisure opportunities for local residents. These new clubs and activities will promote social and physical wellbeing, as well as a reduction in social isolation, with positive examples of partnership working and collaborations with others. |
Score |
4/6 |
|
Officer Comments:
Financial and project management plans Their financial and project management plans are sufficient for a project of this size. The large bank balance is due to £140,000 set aside for other projects in the village such as a new pedestrian crossing, along with just under £65,000 ongoing running costs for the Parish. Therefore, officers are satisfied that the parish council’s contribution is all they can afford at this time. Demand for services and other similar facilities Demand for the existing facilities is high and unmet for new activities/groups wishing to use the pavilion and the village hall is also fully booked with regular activities. Internal Consultation Equalities: The serving hatch will need to be at a height where a wheelchair user or a person of small stature can easily use, and the new access ramp is as at an appropriate gradient for all users. Project completion within timeframe The project is estimated to start May 2022 and complete by September 2022. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS The project has scored enough points to be a high priority project, therefore officers recommend funding the full grant as requested.
Officers recommend funding is conditional on the serving hatch being accessible to wheelchair users or a person of small stature and the access ramp is of an appropriate gradient. |
Total score |
28/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
Provision of a new meeting room with
adjacent servery and independent access. This will allow more
flexibility in the use of the building. Those using the
playing field will be able to use the new servery, leaving the
existing kitchen available to those using the hall. This will
open up the facilities to greater community use. Two of the
existing changing rooms are not used and these will be converted to
form the new meeting room. |
|
Where will the project take place? |
Crowmarsh (S) |
|
Community Need, Inclusion and Consultation |
||
What extra facilities (or equipment) will the project provide? |
The project will provide a new
meeting room and servery which will allow increased use of the
facilities and permit use of the pavilion by more than one
organisation at a time. |
|
What new activities will take place because of this project? |
Currently the pavilion is almost
fully booked but the new meeting room and servery will allow
increased use, enabling multiple activities to take place side by
side, using different sections of the building. This will
permit us to take more bookings from community groups.
Currently, we are having to turn away potential hirers wishing to
offer new activities and clubs. For example, we have recently
had enquiries from organisations wishing to extend the current
provision for yoga and a potential hirer who wishes to offer two
sessions per week of 'Dungeons and Dragons'. |
|
How do you know there is a need for your project? |
Following the opening of the new
playground in 2019, there were many requests from members of the
public to provide improved and more accessible toilets for the
benefit of those using the play area and the project has developed
from there. A survey of local families using the playground
showed there was a high demand for improved toilet facilities.
Local groups then raised the question of providing cafeteria
provision for local families and clubs. This was discussed by
the Parish Council and referred to the Environment and Recreation
Ground management committee. |
|
Community benefit |
||
Who will benefit from your project? |
The current list of groups using the
pavilion is as follows:
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
The new toilets and baby change room
will permit access to all, including young families, those with
disabilities and special needs. In addition, the new meeting
room and servery will enable increased use of the building and
community use by all sections of the local population. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
The council has declared a climate
and ecological emergency and its support for the Climate and
Ecological Emergency Bill. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
The Pavilion was built in 1992 and
has always been managed by the Parish Council, via the Environment
and Recreation Ground sub-committee. The ongoing costs and
maintenance will continue to be the responsibility of the Parish
Council. Together with the Recreation Ground, this is our
main asset and the only building owned by the Parish Council.
Day to day management is carried out by our caretaker. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
In addition to salaries and insurance
costs, grass cutting and grounds maintenance costs £12,000,
tree work £3,500 and ongoing maintenance and repairs
£8,000. The budget for dog bin emptying is £4,700
and waste collection costs £1,000. Utilities cost
£2,400 per year. There is a budget for servicing and
inspections which is £3,200. Purchase and maintenance of
sports equipment is expected to cost £5,000. On-going
maintenance of the playground equipment is £4,000 and sundries
including audit fees are expected to cost £3,700. |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
The project is designed to extend the
facilities available to the wider community and enable more
residents to take part in the opportunities it will provide for
social and sporting events. It will encourage the development
of new clubs and activities to serve the needs of the increasing
population in the light of the significant housing development
taking place locally. With 500 new houses being built in the
parish, the population is set to increase by 70.5% and the Parish
Council is keen to cater for the significant numbers of new
residents who will be moving into the local area. |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
A Service agreement is being drawn up
with Crowmarsh Youth FC to allow them to rent the facilities for 10
years in return for charity funding to maintain the playing fields
for up to £5,000 per year. |
|
Watlington Parish Council |
Ref |
SCAP21-22/65 |
||
Multi Use Games Area (MUGA) |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 500 |
||||
|
||||
Total project cost |
£227,543 |
SCAP grant requested |
£75,000 |
|
Organisation's contribution |
£104,000 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£0 |
|
||
Funding still needed for the project |
£123,543 |
Organisation's latest bank balance £254,152.77 |
||
Previous community grants awarded: CGS20-21/251 - Watlington arts HUB resources £1,000 (2021) CGSWA\8 - Security cameras for Watlington Sports Pavilion £3,395 (2019) SCap\48 - Watlington Paddock play area improvements £9,998 (2017) CO25k£\233 - Regeneration of Watlington Recreation Ground £98,711 (2008)
Scoring |
|||
Community need, inclusion and consultation Creation of a new Multi Use Games Area and floodlighting for Watlington that meets the needs of all members of the community. Consultation has been carried out with the community through a Sports & Recreation Survey in August 2021 and is included as part of the Watlington Parish Council Strategic Plan. They have also consulted with local sports clubs, youth groups and senior citizen groups at the design stage and have set up a project board that includes council members and residents. |
Score |
6/6 |
|
Community benefit The project will provide a new sporting facility that’s open to anyone to access and offers free play which meets the needs of Watlington's growing population. It will potentially directly benefit 500 people which is more than other similar projects in the same category. |
Score |
6/6 |
|
Action on Climate Emergency Watlington Parish Council declared a climate emergency in 2019 and in 2021 adopted a Climate Action Plan which sets out the actions that the Parish Council will take, over the period until 2050. The Parish Council has committed to reduce its own carbon footprint to net zero by 2025 and to report regularly on progress. |
Score |
6/6 |
|
Financial sustainability The parish council has a funding plan but has not applied for all of it yet, having identified National Lottery and Sport England as potential funders. 46 per cent of the total project cost has already been secured. They confirm that a sinking fund will be created to cover a replacement playing surface. |
Score |
2/6 |
|
Themed criteria for chosen corporate plan priority It is clear how the MUGA will provide better outcomes for the community, working closely with local sports and social clubs in order to design a facility that meets the community's needs. |
Score |
4/6 |
|
Officer Comments:
Financial and project management plans They have sufficient plans for the pitch, lighting and site as a whole, with helpful management plan summary. With a full award, £48,543 will still need to be raised before the project is fully funded. Officers note that they may be able to apply for further CIL funds should it be required to complete this project. Demand for services and other similar facilities The applicant states that 500 residents will benefit from the project, with further growth over the next 5-10 years due to housing developments. There is no similar facility within approximately ten miles of Watlington. Internal Consultation Equalities: Ensure inclusive access to the MUGA i.e. for wheelchair users. Leisure: A much needed facility within the parish to support residents to become more active. Multisport facilities are promoted by Sport England. Project completion within timeframe The anticipated project start date is 16 May 2022. Should the project be awarded, the scheme's policy would allow 12 months for Watlington Parish Council to raise the remaining funds and start work, and 24 months to complete the project. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS The project has scored enough points to be a high priority project, therefore officers recommend funding the full grant as requested. Officers have some concerns about the level of unsecured funding still to raise, however this should be achievable against the organisation’s funding plan in the timeframe permitted by the scheme.
Officers recommend funding is conditional on the facility being inclusive for wheelchair users/wheelchair sports, ensuring any gates are wide enough to allow access. |
Total score |
24/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
Applicant responses |
||
Details of the project |
This project is for the development of a new artificial Multi Use Games Area (MUGA) pitch with floodlighting at Watlington recreation ground. The facility will provide a new fenced, floodlit, multi use surface (40m x 30m). The new facility will replace a small macadam area that does not meet the requirements of the local community. The new facility will meet the needs identified by local sports clubs such as football, basketball, netball as well as keep fit groups and the local youth club. |
|
Where will the project take place? |
Watlington (S) |
|
Community Need, Inclusion and Consultation |
||
What extra facilities (or equipment) will the project provide? |
The new multi-use games area (MUGA)
will replace an old, badly worn, macadam surfaced small basketball
court that is limited in its utility to cater for other
sports. It is too small for most sports and its surface is
unsafe. It has reached the end of its useful life and needs
to be replaced by a modern facility that offers a greater number of
uses including; basketball, netball and 5-a-side football.
The facility can be divided across the line of play to enable the
playing surface to be split into two courts. The MUGA will be
floodlit to enable after dark use by local teams for training and
competitive games. The MUGA will also provide an ideal venue
for keep fit classes catering for all age groups and physical
abilities. Its design will enable ease of access for
wheelchair users ensuring greater accessibility for disabled and
mobility impaired members of the community. This will be a
facility that will be open to a community of users that stretches
beyond the parish boundaries of Watlington. There is no
similar facility within approximately 10 miles of Watlington. |
|
What new activities will take place because of this project? |
The new MUGA will provide a facility that will be adaptable for many activities beyond just conventional sport. It will provide a modern playing surface that can be used by both able bodied and disabled people. The addition of fencing and floodlights will allow a greater variety of sports to be played, including walking football, hockey and rugby. There is the potential for wheelchair sports to be played. It will also be a safe environment for the introduction to junior sport. Its size and design will allow two games, sports or other activities to be carried out simultaneously. Keep fit classes can be run during the day or at night under floodlight ensuring accessibility for a larger number of the community. In short, the new MUGA will greatly enhance the sports and fitness provision within Watlington. It will cater for all age groups and sporting abilities. |
|
How do you know there is a need for your project? |
The Watlington Parish Council Strategic Plan, which is underpinned by the Watlington Neighbourhood Development Plan, has as a core objective CO4 (Make good provision for new and existing residents by) providing a good mix of facilities for sport and recreation. This includes a contribution to the cost of providing new and improved facilities for sport and recreation The requirement for a new MUGA was confirmed through the Watlington Parish Council Sports & Recreation Survey carried out in August 2021. |
|
Community benefit |
||
Who will benefit from your project? |
Watlington has a population of
approximately 2600 residents. This number will increase by at
least 50% over the next five to ten years as the planned housing
development of 500 homes is completed. It is the Parish
Council’s objective to ensure that new sports and recreation
facilities provided in the town meet the requirements of both the
growing population and the existing clubs and organisations.
The following have been identified as potential users of the
new MUGA facility:
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
The MUGA is primarily a sporting facility however, it will be available for use by all community groups thus, catering for a very wide range of needs. It has been designed to allow access either in an informal manner (free play use during daylight hours) or, for more formal sporting/recreational activity, through book sessions during both daytime and in the evenings. No individual or groups will be excluded from using it and the design will ensure that it is easily accessed by people of all ages and physical abilities. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
Watlington Parish Council (WPC)
declared a climate emergency in 2019 as follows: |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
There will be an annual maintenance
cost of approximately £650. The industry standard for
one hour of maintenance for every 10 hours of use. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
The Parish Council has financial
commitments in terms of three staff, running and maintenance of
parish buildings, real estate, business rates and town
infrastructure. |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
The provision of a new all-weather, floodlit and accessible MUGA will greatly enhance the sporting facilities provided by the Parish Council. The present facility is no longer fit for purpose and is not flexible enough to cater for a wide variety of sports and activities. It is restricted to daylight use only and its surface (macadam) is not a safe surface for sport. Therefore, the objective of the Council is to provide a facility that meets the requirements of the widest possible cross-section of the community. This includes established sports clubs, fitness providers, youth groups, senior citizen groups and individuals. The Council is keen that new activities, for those who do not presently participate in sport or fitness, will thrive. Activities aimed at the older section of the community and those less able to play sport will be encouraged. For example, walking football, rugby and hockey. Also, outdoor group fitness classes for all ages to improve fitness levels and wellbeing. The measure of success will be the amount of use and the popularity of the facility, throughout the year, across an expanded number of user groups and activities. |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
Watlington Parish Council has worked closely, and consulted with, the local established sports clubs, youth groups and senior citizen groups in order to design a facility that meets as wide a set of requirements as possible. The Council has set up a project board that includes council members and residents. This board will oversee the project. |
|
Sonning Common Parish Council |
Ref |
SCAP21-22/55 |
||
Lighting the MUGA and pathway at Memorial Park |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 8,500 |
||||
|
||||
Total project cost |
£112,732 |
SCAP grant requested |
£56,366 |
|
Organisation's contribution |
£56,366 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£0 |
|
||
Funding still needed for the project |
£56,366 |
Organisation's latest bank balance £407,832.25 |
||
Previous community grants awarded: CUE25k£\300 – Baskerville Road Play Area £13,571 (2008) CUE15k£\1240 - Skatepark project £13,957 (2014) SCap/70 – Landscaping skatepark and village bins £12,493 (2015) SCap16/24 – Kitchen upgrade £7,849 (2016) CGS20-21/137 - Memorial Hall Field equipment and furnishings £5,500 (2021) SCap18-19\32 - Lea Road Park resurfacing £18,629 (2020) SCap18-19\78 - Village Hall Flat Roof Replacement and Insulation £13,444 (2020) SEAG\29 - Sonning Common Foodbank Supplies and Running Costs £5,000 (2021)
Scoring |
|||
Community need, inclusion and consultation The project moderately improves the capacity of Sonning Common's Memorial Park by installing lighting for their Multi Use Games Area (MUGA) and pathways, enabling the facility to be used by the public and community groups in the evening. Substantial consultation has been carried out with villagers via focus groups with local organisations and a residents Sporting and Recreation Needs survey. It is also included in their neighbourhood plan. |
Score |
4/6 |
|
Community benefit The addition of lighting will ensure the park and its sporting facilities are available for anyone from Sonning Common and surrounding villages to use safely in the dark. Sonning Common Parish Council has consulted with numerous sports, youth and social clubs to encourage participation in project delivery. The project will also benefit a greater number of residents when compared to other projects in the same category. |
Score |
6/6 |
|
Action on Climate Emergency The organisation has implemented multiple or regular minor events, activities or services that contribute to the Climate Emergency. The parish council has voted to support the Climate and Ecological Emergency Private Members Bill. They do not currently have a climate plan or strategy but have formed a working party to create one. They have given examples of Climate Emergency related activities, including sustainability criteria in tendering for the play area and plastic free marketing campaigns. |
Score |
4/6 |
|
Financial sustainability Sonning Common Parish Council is funding the remaining 50 per cent from their own funds which have been secured from parish council funds, CIL and S106 funds earmarked for Memorial Park. Should they only receive a partial grant from the council, they have stated that they will cover the balance themselves, at the expense of other projects at the Park (not specified) but cannot fund the whole amount. They have budgeted for ongoing costs and have a sinking fund. Although the organisation is making a 50 per cent contribution, officers have removed two points as their bank account is healthy, suggesting they could make a greater contribution or fund the project themselves. |
Score |
4/6 |
|
Themed criteria for chosen corporate plan priority Lighting for the MUGA and pathways at Memorial Park will expand use of the facilities into the evening, therefore promoting social wellbeing. It will increase usage throughout the winter months, and allow the parish council to collect more hire fees to improve the financial sustainability of the site. There are good examples of partnership working regarding project delivery. |
Score |
4/6 |
|
Officer Comments:
Financial and project management plans The parish council's plans are sufficient and planning permission has been granted to install the new lighting for Memorial Park which is located within the Chilterns AONB. The organisation states that their contribution is based on the available reserves earmarked for Memorial Park, and any further contribution beyond the 50 per cent already allocated will be at the expense of other projects. Demand for services and other similar facilities This project is potentially reaching the greatest number of indirect beneficiaries of all the projects submitted for the 2022 funding round. Improvements to the Memorial Park were included in the 2016 Neighbourhood Plan, and confirmed by an independent Nortoft ‘Open Space, Sport and Recreation’ Report. The organisation explains that other multiuse facilities, which may serve the needs of Sonning Common and its rural neighbours, cannot be reached by public transport. Internal Consultation Leisure: The project should ensure that low cost hire of the MUGA is balanced with also allowing some informal community use in the evenings.
Project completion within timeframe With no further funding to be secured, the project could begin 2 May 2022 and complete by 17 June 2022. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS The project has scored enough points to be a high priority project, therefore officers recommend funding the full grant as requested. |
Total score |
22/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
The development of Memorial Park as a
sport and recreation ground came forward under the Sonning Common
Neighbourhood Plan, which was adopted in 2016. This application
seeks funding to provide lighting at Memorial Park, which is
required to provide a safe and welcoming space, allowing residents
the freedom to exercise at their own pace at a time which suits
them. |
|
Where will the project take place? |
Sonning Common (S) |
|
Community Need, Inclusion and Consultation |
||
What extra facilities (or equipment) will the project provide? |
This project creates an opportunity
to offer the use of a new recreation ground at hours to suit our
residents, who have multiple needs and requirements. A lit
community publicly open sports facility is something which does not
currently exist in Sonning Common. |
|
What new activities will take place because of this project? |
The lighting of the MUGA and the
pathway will create opportunities for exercise during the
eveningswhich would not be possible for many users otherwise. The
MUGA lighting will make the site more desirable to community sports
groups to use and create opportunities for groups to use the
facility in the evening over the winter months. We have already
received enquiries from local football teams. |
|
How do you know there is a need for your project? |
An initial consultation with
villagers regarding Memorial Park took place in 2018 via focus
groups with representatives from scouting, schools, youth club,
charity groups etc, this was followed by an exhibition of ideas for
the facility. These ideas were drawn together as part of a Business
Feasibility Plan completed by LDN Consulting (leading consultants
for sports). This plan formed the basis of the project and a
further survey of residents was conducted in April 2021 to
investigate updated requirements of the site. 81% of the survey
respondents wanted the MUGA and pathway to be lit. |
|
Community benefit |
||
Who will benefit from your project? |
Many local clubs and groups will
benefit from this project, particularly those who do not currently
have an outside space for evening activities, such as Sonning
Common Youth Club. Lighting ensures the park and its amenities are
accessible for all and that the facilities can open for longer
hours, thus creating more activity opportunities. To date we have
consulted with FISH, Maiden Erlegh Chiltern Edge School, Sonning
Common Youth Club, Rotherfield Football Club, Kidmore End Football
Club, Brownies, Scouts, Cubs, Florence House Children's Home,
Active Leaders, Walking Netball and Walking Football, Sonning
Common Health Walks, and Sonning Common Health Centre with the
prospect of social prescribing at the park in the future. Thelocal
football clubs have already enquired with regard to using the MUGA
in the winter months, however these possible hires for the
community depend on lighting be available. |
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
Memorial Park will combat loneliness,
anti-social behaviour, decreased fitness levels and rural isolation
issues. The site will cater for 8500 inhabitants of Sonning Common
and surrounding areas. Villages neighbouring Sonning Common
(Peppard, Stoke Row, Checkendon, Kidmore End, Tokers Green) also do
not have such facilities within reach. Memorial Park will offer
community cohesion as an active destination for the area - the
lighting will extend the hours that the park can be used and thus
help to improve mental health, well being, fitness and activity
levels for many users including the elderly, disabled and those
with mental health illnesses. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
Sonning Common Parish Council
recently voted to support the Climate and Ecological Emergency
(CEE) Private Members Bill. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
Sonning Common Parish Council has a
budget for the maintenance of Memorial Park, of which some will be
allocated to lighting repairs and maintenance as necessary. It is
anticipated that the lighting will not require substantial
maintenance once installed. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
Sonning Common Parish Council has a budget based on the precept which includes all normal and standard operating costs. We also hold some earmarked reserves set aside for specific village projects and improvements. Our contribution to this lighting project will come from those earmarked reserves, (which are not adequate to fund the whole Memorial Park project). Please note that without the lighting we will not be able to let the MUGA for most of the year, therefore reducing our income. The Parish Council will fund the remainder after any grant is received from SODC, but if this is more than 50% of the amount required then it will be at the expense of other projects. |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
This project will make a difference
to the community of Sonning Common and surrounding villages in that
the sport and activity provision at Memorial Park will be extended
to include evenings and early mornings, rather than being
restricted to day light only. |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
Sonning Common Parish Council has
partnered with many community organisations on this project. Maiden
Erlegh Chiltern Edge have been involved in ensuring provision at
the site is not duplicated at the school and students have been
working on sustainability options. We have consulted with Sonning
Common Health Centre and continue to explore 'social prescribing'
options. Scouts, Guides, Brownies and the Youth Club have been
involved in discussions regarding the final provision of indoor and
outdoor space at the site. The Green Gym recently planted 420
saplings on the site which were obtained from the Woodland Trust.
Local families with children who have special needs were consulted
and helped to design the new play area. Florence House Children's
home are currently working with the council to fundraise for a
friendship bench at the new play area and will be involved in
future play provision at the park. |
|
Millstream Day centre |
Ref |
SCAP21-22/61 |
||
Benson Millstream Centre Extension and Refurbishment |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 500 |
||||
|
||||
Total project cost |
£124,424 |
SCAP grant requested |
£29,678 |
|
Organisation's contribution |
£84,746 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£10,000 |
|
||
Funding still needed for the project |
£29,678 |
Organisation's latest bank balance £312,951 (£258,951 as evidenced from bank statements) |
||
Previous community grants awarded: CU15k£\822 – Access project £11,096 (2011)SC17-18/59 - Kitchen Refurbishment £17,950 (2017) CGS19-20/50 - Centre Refurbishment £1,000 (2019) CGSBC1\7 - Kitchen Waste Disposal Unit £500 (2019) SCCG/70 - Way Forward phase 1 £1,000 (2019) SEAG/15 - Covid response project £4,400 (2020) CGS20-21/82 - Dining Room Refurnishing £300 (2021) CGS21-22/41 - Millstream Refurnishing £1,000 (2021)
Scoring |
|||
Community need, inclusion and consultation The project will extend and refurbish the day centre and lounge to create a larger social space, enabling more activities to take place for clients, and allowing for wider community use. The project has given full consideration to all users, particularly those who are elderly, disabled or mobility impaired, and those with dementia. Their development plan includes consultation with partners, the wider community, existing members and staff/volunteers. |
Score |
6/6 |
|
Community benefit The project will increase the day centre’s capacity to support vulnerable residents, and encourage greater use by its regular members and external groups i.e. local GPs, local dementia support group, Age UK (amongst others) who use the facility for meetings, classes etc. |
Score |
6/6 |
|
Action on Climate Emergency The organisation has given some consideration into possible actions that address the Climate Emergency, with limited evidence of any actions undertaken. The organisation will be implementing activities that contribute to the Climate Emergency such as replacing all lightbulbs with energy efficient ones, as part of its refurbishment plans. |
Score |
1/6 |
|
Financial sustainability Millstream has secured all the other funding needed for the project. They have a contingency plan should they only receive a partial grant from the council, which includes looking for funding elsewhere and reviewing overall costs to work within the funds available. A successful capital grant bid will complete the funding of the building works. They’ve also budgeted for the ongoing costs through the additional income received from venue hire, but not eventual replacements. |
Score |
5/6 |
|
Themed criteria for chosen corporate plan priority Millstream Day Centre supports vulnerable people and helps to reduce social isolation. They have provided a clear response that addresses how a capital grant will provide better, measurable outcomes to the community. Good examples of partnership working and collaboration. |
Score |
4/6 |
|
Officer Comments:
Financial and project management plans Millstream is relying on a professional estimate for the project costs, and have considered how these costs will increase in line with inflation. They have already secured 77 per cent of the funding required. SODC Councillor Community Grants have provided some support for the wider project, including design costs and furniture which are not included in the total project costs presented here. Demand for services and other similar facilities The Centre currently has 40 vulnerable adults who attend regular sessions and a further six who are supported by the At Home service. There has been a 25 per cent increase in customer numbers since the pandemic and Oxford Brookes Projecting Older People Population Information (POPPI) data indicates a 30 per cent increase in +75 population in the local area by 2030 before housing growth has been factored in. Internal Consultation Equalities: Bi-folding doors will need to be easy to open for people with dexterity issues or those in wheelchairs, or help provided, and all new doors leading to the garden should not require a step down. Project completion within timeframe If funding is in place, the estimated start date is 1 September 2022 and completion will be by 31 October 2022. If awarded over £25,000, they will have 12 months to start the work and 24 months to complete the project. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS The project has scored enough points to be a high priority project, therefore officers recommend funding the full grant as requested.
|
Total score |
22/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
Benson Millstream Centre is now 35
years old. Thanks to support from the Council the kitchen went
through a major refurbishment three years ago. The rest of the
Centre now has, what has been described as an institutional feel
which needs addressing. More importantly the current dining area
can seat 32 diners and regularly operates close to capacity,
however the lounge area seats only half that number. This
constrains the Centre’s aim to provide an activities
programme for its customers and the opportunity for members to sit
and chat, combatting loneliness being one of the Centre’s key
objectives. |
|
Where will the project take place? |
Benson (S) |
|
Community Need, Inclusion and Consultation |
||
What extra facilities (or equipment) will the project provide? |
The Centre has 40 vulnerable adults
who attend regular sessions at the Centre and a further six who are
supported by the @Home service. On a daily basis we support 25%
more customers than we did before "lockdown". Oxford Brookes POPPI
data indicates a 30% increase in +75 population in local area by
2030 before housing growth factored in. |
|
What new activities will take place because of this project? |
Research for Centre development plan
revealed locals thought the Centre had a "tired, institutional"
feel. The project will address what is is making the facility for
individuals/community groups currently off putting |
|
How do you know there is a need for your project? |
Insufficient capacity in lounge area
for existing customers which restricts access to activities. 32
seated for meals only 16 in lounge. |
|
Community benefit |
||
Who will benefit from your project? |
The main beneficiaries of this
project will be the Centre Users, but these hours can also provide
respite for their carers and give volunteers a feeling of self
worth. We have 40 customers who regularly attend the Centre in
addition to a growing number of local residents who use the @Home
service.
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
The Charities primary aim is to
support the older residents of the area although during lockdown a
much wider section of society was supported. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
Building will be completed to latest
energy saving standards. This will include taking the opportunity
to replace all light fittings with energy efficient models. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
Ongoing revenue implications
shouldn’t be significant, gas and electricity will increase
marginally as we have a larger lounge but some of that cost will be
offset by new flooring which will require less cleaning. Current
carpet tiles get stained by spillages which require specialist
cleaning three or four times per year. That cost will be removed in
future. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
Thanks to three recent donations
Trustees currently expect to breakeven this year. Next year the
closure of the Centre will put the Centre into deficit. A forward
plan quantifying this was part of the supporting paperwork attached
to a recent Revenue Grant bid. |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
Trustees objective, as defined in the
"Way Forward" development plan is to support customers to live
independently for as long as they safely can. |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
Whilst the concept of an extension to
the Centre has been discussed for many years the current initiative
came from the production of the Way Forward plan. This was
constructed following consultation with customers, staff, local
councillors, Age UK, local GP's etc. |
|
|
|
|
Holton Village Hall |
Ref |
SCAP21-22/74 |
||
Sound System and Hearing Loop system for Village Hall |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 300 |
||||
|
||||
Total project cost |
£7,028 |
SCAP grant requested |
£3,000 |
|
Organisation's contribution |
£3,528 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£500 |
|
||
Funding still needed for the project |
£3,000 |
Organisation's latest bank balance £34,912.67 (£16,837 as evidenced from bank statements) |
||
Previous community grants awarded: CU25k£\234 – Extension to storage facility £7,359 (2018) CGSFHH\3 - Film projector and stand £742 (2017)
Scoring |
|||
Community need, inclusion and consultation The project moderately improves a substantial community facility by installing a hearing loop and sound system. Some consultation has taken place with existing users. |
Score |
4/6 |
|
Community benefit The organisation has demonstrated how this project will help the village hall to become more inclusive and accessible for all users, particularly those with a hearing impairment. |
Score |
6/6 |
|
Action on Climate Emergency The organisation has implemented multiple or regular minor events, activities or services that contribute to the Climate Emergency. An energy audit was carried out in 2013 and actions were taken to address all issues raised. There is no evidence that the organisation has continued to carry out climate actions as a routine part of their workplan. No evidence of a climate action policy/statement was submitted. |
Score |
3/6 |
|
Financial sustainability They have secured all the other funding needed for the project and have some contingency funding should their application be unsuccessful or partially successful. Ongoing costs will be covered by the village hall maintenance programme. |
Score |
5/6 |
|
Themed criteria for chosen corporate plan priority Holton village hall is a facility that encourages culture and leisure, with the installation of a hearing loop and sound system to promote increased usage and improved social wellbeing. |
Score |
3/6 |
|
Officer Comments:
Financial and project management plans The village hall’s plans are sufficient for installing a new sound system. The organisation seems reliant on grant success from SODC and has not applied for any other external funding. They do have £15,000 in a contingency fund for major capital expenditure but £12,000 of this is ear-marked for replacing the hall floor. Demand for services and other similar facilities Although the number of residents benefiting from the project is not high compared to other projects in the same category, the hall provides the only venue in the village for activities and meetings. The applicant has demonstrated support from external clubs/organisations that use the facility. Internal Consultation No S106 funds available. Equalities – This project will enable increased access for hearing impaired users of the hall. Project completion within timeframe With no further funding to be secured, the project can begin 1 May 2022 and complete by 30 June 2022. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS The project has scored enough points to be a high priority project, therefore officers recommend funding the full grant as requested. |
Total score |
21/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
The sound system will consist of a wall mounted rack unit into which the components will be securely mounted. Contained within will be a Yamaha 8 input stereo mixer amplifier, hearing loop amplifier, Bluetooth receiver, twin channel professional radio microphone receiver with two hand mics and charger. External to the rack will be three powerful wall mounted loudspeakers plus a small wall mounted subwoofer near the rack to provide additional bass for cinema or background music. Fixing of all cabling and hearing loop system. |
|
Where will the project take place? |
Holton (S) |
|
Community Need, Inclusion and Consultation |
||
What extra facilities (or equipment) will the project provide? |
Existing speakers are out of date and improvements need to be made to accommodate our regular Film Nights which are popular with all ages in the village. The Hearing Loop system will enable more inclusion of the elderly and others with hearing issues who will be encouraged to join in with village activities. Simpler modern sound system will be easier for everyone to access both regular hall events and hirers of the hall. |
|
How do you know there is a need for your project? |
The improvements and introduction of a modern sound and hearing loop system will enhance our activities and could encourage more use of the hall from a wider audience and improve the services provided by the Village Hall. We have received requests from users who are hard of hearing to provide for their needs. |
|
Community benefit |
||
Who will benefit from your project? |
Film Club, Brownies, Children's Parties, WI, Garden Groups, Dementia Active group, Church group, Parish Council Meetings and Village Meetings. Holton Players a local amateur dramatic group who put on two plays a year in the hall, The hall is hired out for weddings, christenings, wakes and numerous social parties and occasions throughout the year. The Hall provides the only venue in the village for village activities and meetings.
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
The Hearing Loop system will benefit the elderly and any with hearing impairments. The upgrades in the sound system will enable the hall to host village social events with improvements in connecting with all ages and abilities. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
The main hall ceiling has been replaced with improved insulation to the maximum depth. An Energy Audit was undertaken in 2013 and all the issues raised have been put in place.Replaced wooden windows with Double glazed units and replacement well insulated doors and fire doors. Radiator valves, boiler timing system, low energy lights. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
Ongoing costs will be covered in the village hall maintenance programme. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
The village hall has a reserve of £12,000 set aside to cover annual running costs in case of an abnormal situation where normal revenue streams cease, and £15,000 in a contingency fund for major capital expenditure. For example, we are anticipating having to replace the hall floor in the next couple of years at an estimated cost of £12,000. |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
Inclusion for those with issues
relating to loss of hearing - the hearing loop system will provide
a means for all to take advantage of village hall events. |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
The Village Hall Management Committee work with the village and is the main organiser of village events such as: Summer Party using the hall and the adjoining Village Orchard space, St Bartholomew's Church in Holton uses the village hall for social gatherings after Christmas Carol concerts and for the Harvest Supper, Quiz Nights and regular open evenings for the village. The Guides and Brownies use the hall and adjoining orchard for their summer meetings, Bridge Club meet once a week, Table tennis on two nights of the week and a religious group meet on the Sunday weekly. All the above and the WI, Yoga groups and other hirers are all enthusiastically behind this opportunity to provide an up to date sound and hearing loop system. |
|
SOFEA |
Ref |
SCAP21-22/82 |
||
Installation of training kitchen |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 3,258 (250 direct/3,008 indirect beneficiaries) |
||||
|
||||
Total project cost |
£111,270 (adjusted to £99,661 to include only corresponding quotes) |
SCAP grant requested |
£24,000 |
|
Organisation's contribution |
£0 |
Total other funding applied for but not yet secured |
£200,800 |
|
Other secured funding |
£0 |
|
||
Funding still needed for the project |
£111,270 |
Organisation's latest bank balance £216,821.92 |
||
Previous community grants awarded: NHBA\10 - Get to Work' training programme £4,000 (2015) VC1R\62- New refrigeration unit £5,000 (2017) VNHB\2 - Futures Placed £8,000 (2017) CGS19-20/108- SOFEA education and training electives £5,400 (2020) CGS20-21/117 - SOFEA Community Larder £5,215 (2021) CGS20-21/246 - Second Didcot Community Larder £4,700 (2021) SEAG\37 - South Oxfordshire Community Larders - powered by SOFEA £4,850 (2020) TGS\100043 - Transporting increased quantities of food for vulnerable communities across South Oxfordshire £15,000 (2021) TGS\100058 - Minibus to transport vulnerable children and young people £5,478 (2021) VTGS\100013 Transporting increased quantities of food for vulnerable communities across the Vale of White Horse £15,000 (2021) SRev\41 – four-year Revenue funding £105,000 (2017-2022)
Scoring |
|||
Community need, inclusion and consultation The project will provide a new facility for the community by creating a 390sq.ft commercial kitchen to further the education, training and skills development of vulnerable young people. This is part of SOFEA's Nourish & Flourish project which will work to tackle obesity and reduce risks of associated chronic ill health and has been developed alongside local GPs and Good Food Oxfordshire. |
Score |
4/6 |
|
Community benefit The project will have a significant impact on the health and wellbeing of disadvantaged young people through the provision of work, study and wellbeing programmes. The commercial kitchen to enable learners and trainees to develop new skills and gain qualifications suitable for the catering and hospitality sector. There are also plans to cook and distribute at least 100 meals each day for local groups supporting vulnerable people in the community. |
Score |
4/6 |
|
Action on Climate Emergency SOFEA has implemented multiple Climate Emergency related activities as routine activities within the organisation’s workplan, including environmentally friendly adaptations as part of their current site redevelopment, such as air-source heat pumps and LED lighting, in addition to their wider work of reducing and redistributing food waste through community larders and foodbanks. They plan to source electric vans and introduce photovoltaic arrays onto their warehouse roof. They have a draft sustainability policy for the organisation, once approved will actively engage all staff. |
Score |
6/6 |
|
Financial sustainability They’ve applied for all the other funding needed but have yet to secure any funds to support the development of the commercial kitchen. The organisation has not explained how they will budget for the ongoing costs or how they’ll fund eventual replacements. |
Score |
1/6 |
|
Themed criteria for chosen corporate plan priority This project promotes quality employment through training opportunities that could provide future opportunities for disadvantaged young people. One of SOFEA's anticipated outcomes is that graduates of the programme will be offered work experience to progress into apprenticeships and full-time employment within the catering and hospitality sector. Key partnerships include Good Food Oxfordshire, and Didcot Primary Care Network. |
Score |
5/6 |
|
Officer Comments:
Financial and project management plans The organisation has yet to secure any funding for this project, which means the project could be in jeopardy if the additional funds are not found. Total funding applied for from all sources is £200,800 against an overall project cost of £111,270. Please note, the total project cost in this application has been reduced from £111,270 to £99,661 to match with presented quotes, in line with the scheme’s criteria. Revenue funding related to this project has also been requested from the SODC Revenue Grant scheme, to help expansion of SOFEA’s nutrition outreach work in schools and in the wider community. The commercial kitchen, as presented in this application, will be used to train staff and community volunteers. Demand for services and other similar facilities SOFEA's kitchen will be fitted with equipment typically used in commercial kitchens, engaging learners and trainees who have been excluded from local schools and colleges. Direct beneficiaries include 50 learners and 200 trainees. Indirect beneficiaries from the wider Nourish & Flourish programme includes 1,574 year-5 pupils in 52 schools across South Oxfordshire, 434 Community Larder members from Berinsfield, Didcot and Thame Larders and an estimated 1,000 diabetic patients referred by Didcot Primary Care Network into SOFEA’s social prescribing and Nourish & Flourish programmes. Internal Consultation No S106 funds available. Equalities: Ensure that the dimensions of the kitchen permit wheelchair access, including a minimum turning radius and doorway width, with easily accessible worktops that are lower than standard, or Rise and Fall units which can offer multiple heights for use by people with a range of needs. The organisation may need to consider the depth of the sink and taps, making it easy for people of a range of dexterities to be able to use them. Improving the contrasts within a stainless steel kitchen would be useful for those with a visual impairment. Emergency exits out of the building should be at pavement level or have ramps. Project completion within timeframe They are anticipating a project start date of May 2022 and completion within one month. However, officers have concerns that £111,270 needs to be raised to meet their timeframe. Should the project be awarded a grant, the scheme's policy would allow 12 months for SOFEA to complete the project. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS The project has scored enough points to be a medium priority project, however, officers have concerns about the project’s financial viability given how much money the organisation still needs to raise to complete the project within the next 12 months.
However, if the panel are minded to fund the project based on further evidence of secured funding, officers would wish to seek clarification on the difference between learners and trainees, and how dependant the capital and revenue components of the wider Nourish and Flourish project are on each other. Furthermore, officers would need to understand how the community impact of the whole project may be affected by any funding shortfall if they are unable to undertake the whole project. Officers recommend funding is also conditional on taking account of BS8300-2 2018, 19.1 kitchen areas, to ensure that disabled children/volunteers can take part in the project. Discussions to take place with the Council’s equalities officer to agree elements that can be incorporated into the design. |
Total score |
20/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
Applicant responses |
||
Details of the project |
SOFEA’s redevelopment includes
6,000 sq.ft of adaptable learning spaces, a workshop, gym,
technology suite and a 390sq.ft commercial kitchen, increasing the
education, training and skills development for more young
people. |
|
Where will the project take place? |
Didcot (S) |
|
Community Need, Inclusion and Consultation |
||
What extra facilities (or equipment) will the project provide? |
The funding will help pay for the
creation of a 390 sq.ft commercial training kitchen. Whilst
Abingdon and Witney College offers a domestic cookery course, it is
not designed for commercial catering. Our kitchen will be fitted
with equipment typically used in commercial kitchens. Our
professional kitchen will be led by an ex-Manoir chef and Director
of its cookery school who will guide and train our learners and
trainees, supporting them to build their interest in the
opportunities of working in the catering and hospitality sector,
helping them develop new skills and creative talents, gain
qualifications and build their personal credentials. |
|
What new activities will take place because of this project? |
SOFEA supports 50 vulnerable learners
and around 200 trainees each year at its Didcot site –
most of whom have been excluded from formal education and
experienced childhood adversities. We expect every young person to
be involved in the kitchen programme at different times. For those
showing aptitude or applying for specific training. |
|
How do you know there is a need for your project? |
Since the start of the Covid
pandemic, many jobs across catering and hospitality were lost and
the sector is now struggling to recruit experienced staff in order
to restart businesses of all types. With Oxfordshire’s
historical hospitality sector, the project consultant has noted a
growing demand for local, younger skilled staff. |
|
Community benefit |
||
Who will benefit from your project? |
Direct beneficiaries
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
SOFEA’s first strategic
objective is: “The relief of poverty and need in particular
by the provision of food”. Our intentions are to ensure that
greater numbers of individuals and families receive appropriate
quantities of nutritious food, emotional support and additional
wrap-around services, helping them to maintain their physical
health and mental wellbeing whilst managing their
finances. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
Environmentally friendly
adaptations |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
Operational costs |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
Reserve Policy |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
As the regional centre for FareShare
UK, SOFEA ensures that people living in areas of deprivation,
experiencing food insecurity and food poverty, are supported with
supplies of high-quality nutritious food within safe and trusted
community venues. Whilst the financial savings can be spent on
additional food, clothes and household bills, the consumption of
fresh food (including fruit and vegetables) helps to improve
people’s general health and wellbeing. |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
Key partnerships include: |
|
Wheatley Parochial Church Council |
Ref |
SCAP21-22/64 |
||
Revival at St Mary's |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 500 |
||||
|
||||
Total project cost |
£623,160 |
SCAP grant requested |
£75,000 |
|
Organisation's contribution |
£323,842 |
Total other funding applied for but not yet secured |
£184,318 |
|
Other secured funding |
£40,000 |
|
||
Funding still needed for the project |
£259,318 |
Organisation's latest bank balance £265,228 (£314,884 as evidenced from bank statements) |
||
Previous community grants awarded: CGS19-20/10 - Revival at St Mary's £4,000 (2019)
Scoring |
|||
Community need, inclusion and consultation The project significantly improves the capacity of St Mary's Parochial Church by adapting the interior to greatly increase its use as a hireable venue for the whole community. Consultation has been carried out with the community/other stakeholders. |
Score |
5/6 |
|
Community benefit The project will provide a facility that’s available to anyone to access, not just church members, and includes a full accessibility audit. Examples of interested groups/activities pledging to use this space include: an organisation for children and young people with autism and learning disabilities, a table top cricket tournament for people with disabilities, a dementia group, a mindfulness course and a series of talks around palliative care and mental health. |
Score |
6/6 |
|
Action on Climate Emergency |
Score |
2/6 |
|
Financial sustainability St Mary's have applied for all the funding needed and have already secured 58 per cent of the balance. They have not planned for contingency funding, should some of their applications be unsuccessful or partially successful, but have presented different scenarios for completing the project against different budgets depending on funds raised. They have considered how they will fund ongoing costs from future hire fees or contributions from church members. |
Score |
3/6 |
|
Themed criteria for chosen corporate plan priority Refurbishment of a community building such as St Mary’s improves social isolation. The applicant has described some examples of partnership working to support project development and community engagement at the initial planning stage. This has not been scored against the Action on the Climate Emergency priority, however, whilst acknowledging the difficulties of working within the confines of an old building, officers wish to note some concerns around the scope of this project in the current Climate Emergency. |
Score |
3/6 |
|
Officer Comments:
Financial and project management plans Detailed financial plans have been provided which present different scenarios for achieving their large funding target. Currently, 58 per cent of the budget has been raised, with further contingencies in place to allow St Mary's to begin work should further funding not become available. The fundraising plan does not identify how much has been requested from each of the other funders, nor when the likely decision dates will be. Officers would need to understand how the different funding scenarios will impact on their plans for wider community use if they don't achieve their overall target. Demand for services and other similar facilities Currently, St Mary’s Church is the biggest venue in the village for gatherings of 200 people. St Mary's has sought statements of intent from community groups wishing to use the space in the future, but it is uncertain if these will translate into regular bookings and how the pandemic might have impacted potential use of the venue. Officers would be interested to know if work has been done to establish how many bookings a week would be needed to become profitable and when breakeven might be achieved? Internal Consultation No S106 funds available. Equalities: Ensure the access ramp will have the minimum gradient required for wheelchair users. Project completion within timeframe Estimated start date of September 2022 with completion September 2023. Timescales also depend on funding received and contingency planning allows for flexibility with different phases of the project to be completed at a later date should it be required. Should the project be awarded over £25,000, the scheme's policy would allow 12 months for St Mary’s to raise the remaining funds and start work, and 24 months to complete the project. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS The project has scored enough points to be a medium priority project, however, officers have significant concerns about the project’s financial viability given how much money the organisation still needs to raise to start the project within the next 12 months. Officers also raise the issue of how appropriate the scope of the project is in the current climate emergency.
Should the panel still be minded to fund the project, officers recommend funding is also conditional on the access ramp having the minimum gradient required for wheelchair users |
Total score |
19/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
This project is about adapting to
changing needs. St Mary’s Church is a beautiful
building located at the heart of the village. It is used
quite sparingly for acts of worship and infrequently for secular
activities, despite a growing demand for a large flexible space
that would be suitable for a variety of secular activities. Most of
the interior of the church is dominated by a rigid configuration of
heavy pews which can be moved but only with great effort. The
heating system is very poor, and seriously inadequate in
mid-winter.The lighting is dim and uninviting and the kitchen and
toilet facilities are rudimentary. |
|
Where will the project take place? |
Wheatley (S) |
|
Community Need, Inclusion and Consultation |
||
What extra facilities (or equipment) will the project provide? |
This project aims to convert a poorly
lit, poorly heated space, well-appointed for a church service but
of little use for any other activity without great effort, into a
warm, well-lit, welcoming space that is of immediate use to the
whole community for a wide range of activities. St Mary’s
Church potentially can provide a flexible 14 by 13 metre area
positioned at the heart of the village, which can be created
without compromising the architectural heritage qualities of the
building. The renovation includes the following new features: |
|
What new activities will take place because of this project? |
There are existing activities that
occur despite logistical difficulties (moving heavy furniture),
discomfort (cold) and inconvenience (inadequate toilet and kitchen
facilities). These will be expected to thrive in a building that
is, warm, light and easily adapted for the need in hand. The
prospect of the new arrangements has also attracted great interest
from users who need a warm, light, large, open space.For example,
art exhibitions, plays and conferences, which have occurred in the
past after major furniture upheaval, will now proceed with ease.
New ventures that are detailed below include dancing, yoga, table
tennis and disability games, all of which appreciate the wonderful
open space that is revealed once the pews are removed. |
|
How do you know there is a need for your project? |
In 2018, we commissioned a major survey by Leap Discover (Discover Consulting Ltd). Leap Discover describe themselves as a market research tool to help identify the often-hidden needs of the residents within the church’s sphere of influence and to explore the church’s desire to respond to these needs. We were presented with a forty-page report in November of that year, based on a survey of the target population in the area surrounding the church, which in the view of our consultants was more than adequately sampled. The results of the survey are predictably wide ranging, but do highlight loneliness and disability as major issues that need to be addressed. It is encouraging that this was then reflected in the letters of intent that we subsequently obtained. Letters of intent from groups or individuals were elicited simply by exhaustive networking around the village. |
|
Community benefit |
||
Who will benefit from your project? |
Numbers of people who would benefit:
The most recent census gives the population of Wheatley as 4125.
This will increase dramatically in the near future as a further 500
houses are planned. The figure of 500 is 10% of the population.
Many of the activities will draw in people from a much wider area,
so this figure is likely to be a very conservative estimate.
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
The survey of local needsindicated
that loneliness, disability and an aging population were key local
social issues. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
Our architects were instructed to
investigate all options with the aim of designing a renovated
building that was as close to carbon neutral in its energy
requirements as is practically possible. As always, there are
conflicts between carbon neutrality, cost, aesthetics and
efficiency. More detailed explanations of some of what is
summarised can be found in theM&E Feasibility Report. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
We believe that the church building
has enormous potential to be of much greater value to the whole
local community. We anticipate that in 10 years’ time, use of
the building will have grown to the extent that it will be
generally considered to be invaluable. That is the time when
realistic booking fees could be raised to cover both immediate
expenses and long-term maintenance of fabric. In the shot term, the
cost of building maintenance is effectively covered by financial
support from the church members. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
Fundraising activities on behalf of
the project operate separately from day-to-day running of the
Parish and operate in separate bank accounts.f |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
The need for venues where communities
can meet and interact has been amply demonstrated during the
pandemic. The joy when people could meet again as restrictions were
lifted was palpable.,The Clerk to Wheatley Parish Council, has
written) “Wheatley Parish Council wholeheartedly supports the
development of St Mary’s Church as a community and social
space for the use by the many organisations active in our village
and wider community. These organisations actively engage with and
encourage participation across all age ranges and interests, but
some activities are seriously limited by the lack of large flexible
space that would be offered by this project.” |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
Creating networks: |
|
Chinnor RFC - Thame |
Ref |
SCAP21-22/77 |
||
Clubhouse Extension |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 275 |
||||
|
||||
Total project cost |
£175,387 |
SCAP grant requested |
£74,887 |
|
Organisation's contribution |
£10,500 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£ 90,000 *S106 contributions to be applied for |
|
||
Funding still needed for the project |
£74,887 |
Organisation's latest bank balance £182,021.11 |
||
Previous community grants awarded: CO15k£\1313 - Changing facilities and community area extension £100,000 awarded/£45,790 paid (2014)
Scoring |
|||
Community need, inclusion and consultation The project moderately extends a community facility by constructing a single storey extension to the existing clubhouse building. It will provide bigger changing accommodation and an additional access corridor together with extended first floor viewing terrace and an additional external escape stair. Consultation has been carried out within the club. |
Score |
4/6 |
|
Community benefit A single sports club will benefit, facilitating more games of rugby to be played and more spectators to watch the main playing field. More girls/womens’ teams will also be accommodated by the larger changing facilities. The total number of beneficiaries is lower when compared to other projects in the same category. |
Score |
1/6 |
|
Action on Climate Emergency The organisation has implemented multiple Climate Emergency related projects as a routine part of the organisation’s workplan, e.g, tree planting, upgrading lighting to LED, installing a borehole to irrigate pitches, waste reduction etc. They have submitted a sustainability/climate plan showing a high-level commitment by the organisation to addressing the climate emergency including forward plans for the organisation. |
Score |
6/6 |
|
Financial sustainability They have secured all the other funding needed for the project via their own fundraising and S106 funding. However, they do not have a contingency plan should their application be unsuccessful or partially successful. They have budgeted for the ongoing costs and have a general idea how they will fund replacements. |
Score |
5/6 |
|
Themed criteria for chosen corporate plan priority This project expands Chinnor RFC’s changing facilities to encourage increased participation in the sport and promote social wellbeing. They have a Community (outreach) Team working with schools and collaborate with Town Council, and The Thame and Oxfordshire County Agricultural Association. |
Score |
3/6 |
|
Officer Comments:
Financial and project management plans The organisation has attached plans for all elements of the project. Having secured over 50 per cent of their total project cost via Club fundraising and S106, they are nevertheless reliant on this Capital funding application as there is no evidence of contingency funding. Chinnor RFC was awarded £100,000 in 2014 towards phase one of the Club’s planned extension, however, they only claimed £45,790 as did not complete the full works as applied for. This is money that could have funded other projects. Demand for services and other similar facilities This project will primarily enable the club to increase the number of residents who use the facility to play rugby. The current changing rooms are at capacity, and are now a priority because of the addition of a girls rugby section in 2019. Internal Consultation The remaining S106 contribution to be drawn down under Rugby Club facilities (Chinnor RFC) is £91,697.71. An application has not yet been submitted, but funds are considered secured subject to approval via ICMD. Equalities – Officers note that the club does not currently offer disabled/SEN rugby, but could do in the future. It is disappointing that the extension does not allow for the creation of an accessible toilet, though the applicant is looking to provide this at a later stage. The Club should ensure the egress from the additional corridor and 1st floor viewing platform is accessible and safe for disabled spectators.
Project completion within timeframe Estimated start date of works is May 2022 and end date is September 2022 which is possible if all the funding is confirmed by April 2022. Should the project be awarded over £25,000, the scheme's policy would allow 12 months for Chinnor RFC to raise the remaining funds and start work, and 24 months to complete the project. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS The project has scored enough points to be a medium priority project, however, officers note that an award at this level will leave Chinnor RFC with some funding still to raise before being able to start the project.
If the panel are minded to award, officers recommend funding is conditional on there being an accessible toilet as part of the project, and egress from 1st floor and corridor. |
Total score |
19/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
The project consists of a single
storey extension to the existing clubhouse building. It will
provide extended changing accommodation and an additional access
corridor together with extended first floor viewing terrace and an
additional external escape stair. There will be associated
alterations to services, including photo-voltaic (PV) panels on the
roof as well as the construction of new soakaway and some external
paving works. |
|
Where will the project take place? |
Thame (S) |
|
Community Need, Inclusion and Consultation |
||
What extra facilities (or equipment) will the project provide? |
The extended changing rooms will be
used by the all the amateur teams, including the men's seniors
(Falcons, Wildboys & Outlaws), women's seniors (Kites), the
girls' youth teams (U18s, U15s and U13s) and the boys' youth teams
(Colts, U16, U15, U14 and U13). These 12 teams will play 20+
players each match, from their squads of up to 30 players each. By
not needing to allocate two small changing rooms to each team, the
extended changing rooms will facilitate more games of rugby to be
played. |
|
What new activities will take place because of this project? |
The new activities that this project
will enable are that Girls' & Women's rugby can be played at
the club. The cohort of players has grown from seven youth players
at the start of the 2019/20 season to 60 youth players players and
25 adult female players registered with the club at the start of
December 2021. This has added to the number of teams using the
existing small changing rooms. By being able to only allocate one
extended changing per team (rather than two small changing rooms)
more games of rugby will be able to be played at the club. |
|
How do you know there is a need for your project? |
The need has arguably been present
since the original part of the clubhouse was built in the 1980s.
The changing rooms, though an improvement on the previous
facilities (in Towersey), were small by today's standards. It was
all that the club could afford at the time. |
|
Community benefit |
||
Who will benefit from your project? |
There will be four groups of
residents who will benefit from the extended and improved
facilities. They are rugby players, parents of youth rugby players,
spectators and hirers / users of the clubhouse not engaged with
rugby. In addition, there will be benefit to the staff and
volunteers working in and from the clubhouse.
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
The club is committed to providing
and improving access for all. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
The rugby club is actively trying to
reduce its impact on the environment and is working towards zero
carbon. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
The rugby club is well managed and
funds are used to maintain current facilities. The club also relies
on a team of volunteers who help maintain the clubhouse and
grounds. This provides a very cost effective method of completing
running repairs and as well as routine maintenance. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
|
|
Project theme – outcomes |
||
What difference will your project make in your community? |
The key outcome that we want to bring
about with the help of this project is increased participation in
sport. Ideally we'd like it to be touch rugby, walking rugby, touch
rugby or contact rugby, but the most important metric we measure is
the numbers of those participating in sport. We are a big club with
over 1000 members, comprised as follows: |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
The Thame and Oxfordshire County
Agricultural Association (Thame Showground) rent some of their land
to the rugby club, without which the club would not have enough
space for all it's younger players to train and play rugby. The
club are indebted to Thame Showground and work collaboratively with
them to ensure larger events (ranging from fireworks, the
AgriSocial tractor run, the Dog Agility Show, the Thame Show to the
Thame Food Fair as well as rugby club match days) all work
well. |
|
Long Wittenham Athletic Club |
Ref |
SCAP21-22/53 |
||
Pavilion Extension |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 887 |
||||
|
||||
Total project cost |
£72,160 |
SCAP grant requested |
£36,080 |
|
Organisation's contribution |
£10,000 |
Total other funding applied for but not yet secured |
£2,000 |
|
Other secured funding |
£0 |
|
||
Funding still needed for the project |
£62,160 |
Organisation's latest bank balance £10,059 (£10,388 as evidenced from bank statements) |
||
Previous community grants awarded: SCCG/128 - New Boiler and Loft Insulation £1,345 (2019)
Scoring |
|||
Community need, inclusion and consultation The project moderately extends a substantial community facility by creating new referee changing facilities for men and women, and new accessible toilets. Consultation has been carried out with the community via the Neighbourhood Plan, and plans circulated to members and wider community. |
Score |
4/6 |
|
Community benefit New accessible toilets will benefit disabled users of the pavilion and recreation ground and specialist sports changing facilities will enable women officials (referees) to take part in matches (currently not available). This project will benefit a greater number of residents when compared to other projects in the same category. |
Score |
4/6 |
|
Action on Climate Emergency The organisation has implemented multiple Climate Emergency related activities over the last few years, such as new roof insulation, replacing lighting to more energy efficient bulbs, and tree planting. They also plan to introduce energy efficient floodlighting and solar panels. |
Score |
4/6 |
|
Financial sustainability Long Wittenham Athletics Club have a funding plan but haven’t applied/secured all of it yet as it relies on fundraising events and income generated from Club activities throughout the season. A £2,000 grant has been requested from the Parish Council, not yet secured. The Club has budgeted for the ongoing maintenance, but doesn’t say how it will fund eventual replacements. |
Score |
2/6 |
|
Themed criteria for chosen corporate plan priority It is clear how a capital grant will provide better outcomes for the community by supporting the increased participation of disabled and mobility impaired people in leisure and social activities, and the organisation works in close partnership with the parish council. |
Score |
3/6 |
|
Officer Comments:
Financial and project management plans The organisation has yet to secure any funding for this project beyond their own contribution, and would not appear to be able to fund the project any more than they have already committed, which means the project could be in jeopardy if the additional funds are not found. They are also relying on a professional estimate to budget for the project, with the additional risk of costs being higher than expected (though note contingency figures are included in the architects estimate). Demand for services and other similar facilities The applicant states that there are no other community facilities in Long Wittenham offering disabled toilet facilities. Inclusion in the neighbourhood plan suggests this is a priority for the community, and in addition to sports, the pavilion is also used for social activities organised by the Club and hired for events and parties. It is not clear what demand exists for this use. Internal Consultation No S106 available for this project. Equalities: Ensure the external door with push bar is a fire escape and the door measurements are sufficient to allow a wheelchair user to get through . It is recommended to have three separate toilet facilities for women, men and disabled users in the extension. Leisure: New women’s and disabled facilities will help bring the pavilion in line with FA guidance, thereby enabling the Club to continue to compete. This work is supported by South Oxfordshire’s Playing Pitch Strategy, which confirms that the site is well used as there is no spare capacity. The Club should consider approaching other funders such as the FA/Sport England/FCC to see if they are eligible for other grants. Project completion within timeframe The work needs to be completed by end of September 2022 to allow the club to compete in the local football league and ensure that the building is safe to use. The club has raised a concern that if the works cannot be undertaken, there is an additional risk that the club may close. Should the project be awarded, the scheme's policy would allow 12 months for Long Wittenham Athletics Club to raise the remaining funds and complete the project. Grants of over £25,000 allow 12 months to raise the funds/start the project, and 24 months to complete the project. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS The project has scored enough points to be a medium priority project. The council’s Playing Pitch strategy identifies the facility as an asset to the community, and the project will furthermore provide accessible toilets for use by residents and visitors where there were none before. However, officers have significant concerns about how much money the organisation still needs to raise after an award at this level (budget permitting) in order to complete the project within the next 12 months.
Should an award be made, officers, officers would need reassurance that the organisation can afford to make the contribution it has earmarked without putting their Club in financial difficulties, and furthermore, would suggest releasing funds only when the remaining balance has been secured.
|
Total score |
17/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
To build an extension onto the existing pavilion to provide new accessible toilets, larger sports changing facilities, new referee changing for equality purposes to allow both men and women referees/sports officials, new women's toilets and the creation of new disabled toilet facilities. |
|
Where will the project take place? |
Long Wittenham (S) |
|
Community Need, Inclusion and Consultation |
||
What extra facilities (or equipment) will the project provide? |
The project will provide new toilet
facilities for disabled people as the pavilion does not currently
have these. They will be fully compliant with the latest building
regulations. |
|
What new activities will take place because of this project? |
The extension will enable disabled
people to get out and use the facilities to attend community
activities and watch sports activities which take place at the
recreation ground. This will reduce their social isolation
and improve mental wellbeing not only for themselves but for their
families and carers. |
|
How do you know there is a need for your project? |
The Long Wittenham Neighbourhood plan
infrastructure and project list identified the pavilion as a
project that needed upgrading and improvements.The Neighbourhood
plan referendum vote showed 59.9% of residents supported it.
Previous wide consultation with the local community was carried out
as required under the Neighbourhood Plan requirements.
There are no community facilities in
Long Wittenham offering disabled toilet facilities. |
|
Community benefit |
||
Who will benefit from your project? |
Sports - LW AFC - two men's teams and
one boys team
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
Bodkins is open to all, it is a
village amenity and sports ground including a play area and
everyone is encouraged to use the area all year around.
There are currently no facilities for disabled persons and this
will allow them to use the facilities where they currently
cannot. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
Our climate action plan which shows projects already undertaken and plans for future ones. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
Long Wittenham AFC will cover all
future running and maintenance costs for the extension. Most
maintenance works are carried out by volunteers from within the
club and only where necessary are external companies employed to
carry out works. This is to save costs. The club
covers these ongoing running costs through member subscriptions and
fundraising activities. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
The club has no major financial commitments for the foreseeable future apart from ongoing normal everyday costs such as utility bills etc. The club is providing as much funding as possible to this project to enable it to happen. The works cannot be provided without grant support. |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
Improving physical wellbeing by
continued competitive sport and friendly sporting activities i.e.
football, running and rounders for both adults and children. |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
We work with the parish council to
retain Bodkins as a key social area within the village. We
ensure that Bodkins is kept clean and tidy and well maintained on
the parish councils behalf. |
|
Culham Parish Council |
Ref |
SCAP21-22/71 |
||
Culham recreation ground renewal and extension |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 450 |
||||
|
||||
Total project cost |
£89,408 |
SCAP grant requested |
£44,704 |
|
Organisation's contribution |
£12,000 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£0 |
|
||
Funding still needed for the project |
£77,408 |
Organisation's latest bank balance £30,000 |
||
Previous community grants awarded: CGS19-20/215 - Tree Planting £1,000 (2020) CGS20-21/256 - Hedge Planting £500 (2021)
Scoring |
|||
Community need, inclusion and consultation The project significantly improves and extends the capacity of Culham’s playground, and creates an outdoor gym. Consultation has been carried out through their Community Led Plan in 2014, and in a 2020 survey, identifying the need to improve the village’s recreation facilities by providing play equipment for a broader age range and exercise equipment for adults. |
Score |
4/6 |
|
Community benefit The project will provide an outdoor recreation facility that’s available to anyone to access, including families and adults in the village, students from the Europa school nearby and the local nursery and pre-school. Provision will also be made for disabled children and picnic benches installed for all residents. |
Score |
6/6 |
|
Action on Climate Emergency The organisation has delivered one-off or minor events or activities that contribute to the Climate Emergency, such as choosing a sustainable playground supplier. They have given some consideration into possible actions that address the Climate Emergency as part of the consultation process in the development of their new neighbourhood plan. |
Score |
2/6 |
|
Financial sustainability The parish council has a fundraising plan in place but less than 50 per cent is secured. It is not clear if the other funds identified in their plan have been applied for yet. They are contributing 13 per cent of the total project cost from their own funds. They have considered budgeting for maintenance. |
Score |
2/6 |
|
Themed criteria for chosen corporate plan priority A refurbished and expanded playground and recreation area will help to promote social wellbeing and improve social isolation for residents of all ages. There is commitment from the Environmental Gardening Group to help prepare the wider area for the playground. |
Score |
3/6 |
|
Officer Comments:
Financial and project management plans The project management plan is appropriate for a project of this scale and the organisation has provided a maintenance plan with regular inspections and ongoing commitment to fund repairs. Culham Parish Council applied for the same project in 2019 and was not successful due to the significant amount of unsecured funding needed for the project to be financially viable. Since 2020, the parish council has increased its contribution, but the total project cost has also gone up. Unfortunately, this has only resulted in a minor increase in secured funding (5 per cent). Officers note that the existing playground has just a few of the original components remaining. Demand for services and other similar facilities Only limited play equipment currently exists and is due to be removed for health and safety reasons. There is no outdoor gym provision. This project has become increasingly important to the village with the closure of the local school in 2020, meaning children attend several schools in the surrounding area, leaving few facilities in the village for families to meet. Internal Consultation No S105 funds available. Equalities: Officers would recommend a combination of benches with backs and arms, at a suitable height and if picnic benches are to be used alongside, ensure that at least one of them is wheelchair accessible. Project completion within timeframe Providing additional funding can be secured, the estimated start date is 1 October 2022 and will be completed by 1 December 2022. Should the project be awarded, the scheme's policy would allow 12 months for Culham PC to raise the remaining funds and complete the project. Grants of over £25,000 allow 12 months to raise the funds/start the project, and 24 months to complete the project. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS The project has scored enough points to be a medium priority project. However, officers have significant concerns about the financial viability of the project and how much money the organisation still needs to raise after an award is made at this level (budget permitting) to complete the project within the next 12 months.
If the panel are minded to award, officers recommend funding is conditional on there being a combination of accessible benches with back/arms at a suitable height and at least one wheelchair accessible picnic bench alongside the inclusive play equipment and accessible surface/path. Officers would also suggest releasing funds only when the remaining balance has been secured. |
Total score |
17/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
Culham is a community of around 450
people, including many children of varying ages. Currently, there
are limited recreational facilities in the village: the existing
playground has few components remaining. Those that are still in
place are gradually being removed for safety reasons. |
|
Where will the project take place? |
Culham (S) |
|
Community Need, Inclusion and Consultation |
||
What extra facilities (or equipment) will the project provide? |
This project will replace existing
play equipment for children which is extremely limited and becoming
unsafe. The project will provide new exercise equipment for adults
which the current playground does not offer. This will ensure
recreational equipment is available for children, young people, and
adults. |
|
What new activities will take place because of this project? |
|
|
How do you know there is a need for your project? |
Culham community has consistently
identified providing safe and appropriate recreation equipment as a
priority. A resident survey conducted in 2014 for the Culham
Community Led Plan identified the need to improve recreation
facilities by providing play equipment for a broader age range and
exercise equipment for adults. More recently, an online petition
was organised to demonstrate the strength of support for improved
playground facilities when Culham’s Parish Council was
negotiating a lease extension with Oxford Diocese: it received more
than 130 signatures (evidence of this petition is available on
request but has not been shared because of GDPR). |
|
Community benefit |
||
Who will benefit from your project? |
The recreation ground will be used
predominantly by: |
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
We want everyone in Culham to have
opportunities to meet and get along with others in their community.
To achieve this, we recognise the recreation ground must meet the
needs of the most vulnerable: |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
Culham Parish Council and the
community's residents recognise that urgent action is needed to
address climate change. When residents were surveyed on a range of
issues for Culham's Neighbourhood Plan, which is currently in
pre-submission format, there was near universal approval for future
planning to promote nature recovery and mitigate climate change.
The Neighbourhood Plan mandates the necessary to protect the local
Network which provides an environmental support system for people
and wildlife. This plan is a mechanism for the Parish Council,
District Council and residents to resist development that
contributes to climate change and to insist on mitigation
measures. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
Ongoing costs that will be covered
through Culham Parish Council's budget are: |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
The budget for the financial year 2022/22 was expenditure of £27,626.00 and an income of £21,253. The expenditure includes monies allocated to the reserves for the project. |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
We want to improve community cohesion
through this project ensuring residents regard Culham as a place
where they can get on well with people of all backgrounds. To do
so, we aim to achieve the following objectives: |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
The lack of existing communal spaces within Culham means there are few existing formal groups. Nevertheless, the Environmental Gardening Group is already working to improve the village environment including through clearing pavements and organising litter picks. They have committed to help prepare the wider area as required and to help ensure it remains a healthy and welcoming space. |
|
Thame Shed |
Ref |
SCAP21-22/76 |
||
The insulation of a former agricultural barn storage area to create a suitable workshop environment for Thame Shed, enabling adults to work on DIY projects in wood or metal, creating, making, repairing, refurbishing, either alone or in the company of others. |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 50 |
||||
|
||||
Total project cost |
£7,740 |
SCAP grant requested |
£3,870 *adjusted from £7,740 |
|
Organisation's contribution |
£0 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£0 |
Organisation requested 100% of total project cost. Max permitted 50% |
||
Funding still needed for the project |
£7,740 |
Organisation's latest bank balance £14,019.84 |
||
Previous community grants awarded: CGS20-21/28 - Thame Shed set up costs [not insulation] £3,142 (2021)
Scoring |
|||
Community need, inclusion and consultation The project provides insulation for a new minor facility for the community - ‘Thame Shed’ - which will offer a workshop for adults to work on DIY projects making, repairing, or refurbishing, either alone or in the company of others. Consultation has been carried out in partnership with Thame Town Council and wider community. |
Score |
4/6 |
|
Community benefit The refurbished facility plans to improve social isolation, promote social wellbeing and provide opportunities for those no longer working or have never worked to improve their mental health. Those that use the workshop will have the opportunity to learn skills and eventually gain qualifications. |
Score |
4/6 |
|
Action on Climate Emergency The organisation has researched an 'environmentally sound solution for a metal walled barn' as a one-off action to address the Climate Emergency however, there is no evidence of the implementation of multiple or regular events, activities or services. No sustainability/ climate action policy/statement for the organisation was submitted. |
Score |
2/6 |
|
Financial sustainability They’ve got a funding plan but haven’t applied for all of it yet as they have requested more than 50 per cent of total project cost, which is not permitted by the scheme. Officers note that they have not applied using the total project cost for the full refurbishment of their facility, of which insulation is an essential component. They’ve budgeted for the ongoing maintenance, therefore two points can be scored. |
Score |
2/6 |
|
Themed criteria for chosen corporate plan priority Refurbishment of an old barn that will help to reduce isolation and improve mental wellbeing through the creation of a new service in Thame. |
Score |
4/6 |
|
Officer Comments:
Financial and project management plans As the scheme will fund a maximum of 50 per cent of total project costs, Thame Shed’s request has been adjusted to £3,870. The organisation could have requested the full £7,740 if they had included the full project cost of the wider project. To date £20,142 has been raised against a total cost of £32,266 for adapting a former storage area into a workshop/community space. The spray foam insulation treatment provides the base on which the refurbishment of the workshop can be built, therefore enabling the whole project to commence. Demand for services and other similar facilities Based on the concept of 'Men in Sheds' it will be open to all who wish to get involved in practical activities, either personal or community projects. There are now over 500 Sheds in the UK and one of only a handful in development in South Oxfordshire (Benson, Checkendon and Sonning Common). It will allow the creation of a community facility which, the applicant explains, does not exist in the town or area and will contribute to the well-being and mental health of its participants. Internal Consultation No S106 funds available. Project completion within timeframe Once funding has been secured, the work should only take one week to complete. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS The project has scored enough points to be a medium priority project. A higher score is not possible as the applicant has requested 100 per cent of their total project cost, when only 50 per cent is permitted by the scheme. Officers seek clarity if this was a mistake, as the total project cost of the refurbishment is presented as £32,266 in some parts of the application, rather than just the insulation component as it is currently scored. This has impacted their score for Financial Sustainability, and therefore the recommended grant award. |
Total score |
16/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
Thame Shed will be a workshop
available to anyone in the local community who is not in or no
longer in work, who wishes to be with others engaging in practical
activity, either on individual projects or communal tasks. Chinnor
Rugby Club has granted a ten year lease of a former storage room in
an old agricultural barn on its land. The barn is constructed of
concrete pillars with metal sides and asbestos roof sheets. |
|
Where will the project take place? |
Thame (S) |
|
Community Need, Inclusion and Consultation |
||
What extra facilities (or equipment) will the project provide? |
The project will insulate a
previously inhospitable metal storage area allowing it to be
refurbished and turned into a workshop for making, mending,
creating, repairing or refurbishing. It will become a meeting
place for those out of work or no longer in work, giving
opportunities, particularly for men, to support each other, perhaps
to rediscover their self esteem as they share and learn new skills,
supporting their mental health and well-being. |
|
What new activities will take place because of this project? |
The project will enable the creation
of a purpose built workshop/community room with wood and metal
working equipment and tools available. For some it will simply be a
place to make or repair things, for others it will be a place to
meet others following retirement, redundancy, furlough or inability
to work. Based on the concept of 'Men in Sheds' it will be open to
all who wish to use it, of any sex or persuasion, and provide
weekday opportunities to be involved in practical activities,
either personal or supporting community projects. |
|
How do you know there is a need for your project? |
The concept of creating a Shed in
Thame was taken to the Town Council in 2017 and discussed by its
Community, Leisure and Recreation committee. Following
discussion the committee agreed unanimously to support the creation
of Thame Shed and a Councillor was appointed to report back
regularly on progress. The Town Council later granted the use of
the council chamber for an open meeting and over 40 interested
people met to express their interest and enthusiasm for the
project. A Steering Group, including two Town Councillors,
was formed with the major task of finding suitable premises. |
|
Community benefit |
||
Who will benefit from your project? |
Everyone who eventually uses Thame
Shed will benefit from the project, in that the project ensures the
complete insulation of the workshop area. The main target group of
the workshop will be those no longer working or never having
worked, giving them the opportunity to meet socially on
weekdays. |
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
Thame Shed will provide opportunities
for all sections of the community to feel valued, be supported and
to build their self-esteem. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
The project we seek funding for, the
use of the 'Ecotite' insulation system has been carefully
researched by our Architect of Leap Architects, Thame, and he has
already used it on a number of projects he has designed. Our
architect who sees the enormous social value in the Thame Shed
concept, has donated the services of his practice free of charge
and wholeheartedly promotes the 'Ecotite' system as a perfect
environmentally sound solution for a metal walled barn. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
There are no ongoing financial requirements for this project once the 'Ecotite' spraying is completed. The system is irreversible and therefore it is there for the life of the building. It protects against the premature deterioration of building materials with zero maintenance costs. There is no comparable product or solution so it has only been possible to supply one quote. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
The project for which this grant is
applied for is part of a larger project to create Thame Shed.
The total cost of adapting a former storage area into a
workshop/community area is £32,266.01. The grant applied
for here is for the application of the 'Ecotite' insulation of the
workshop at a cost of £7,740. The Trustees therefore
needed an additional £24,526.01. To date £20,142
has been raised through membership fees and grant aid. If
this application is totally successful then the Trustees still need
to raise a further £4,384.01. |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
The project, the funding of an
insulation system for an old, metal walled agricultural barn, will
be the base on which the work to create a community
workshop/meeting area will be built. |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
The project to insulate the workshop
using the Ecotite system has to, and will be delivered
professionally. The cost of applying this insulation system
is expensive but vital and the the reason for this capital grant
bid. |
|
Woodcote Parish Council |
Ref |
SCAP21-22/70 |
||
New pathway on village green |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 1,000 |
||||
|
||||
Total project cost |
£48,250 |
SCAP grant requested |
£24,125 |
|
Organisation's contribution |
£24,125 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£0 |
|
||
Funding still needed for the project |
£24,125 |
Organisation's latest bank balance £318,711 (£221,739 as evidenced from bank statements) |
||
Previous community grants awarded: CU15k£\985 - Village Hall Flat Roof replacement £4,186 (2013) CCGU15\100057 - Fire alarm system £4,809 (2015) CGS19-20/66 - Tree Planting in Woodcote £1,250 (2019) SCCG/161 - Play Area adjacent to Village Hall £1,000 (2019) SCap18-19\85 - Pathway to enhance safe access to Village Hall & Schools £9,812 (2019) CGS20-21/14 - New Tree planting £1,500 (2021) CGS21-22/96 - Village green improvements; picnic tables £2,628 (2021)
Scoring |
|||
Community need, inclusion and consultation The project moderately improves the village green by creating a new pathway linking the school and other village facilities. Some community consultation is detailed. |
Score |
2/6 |
|
Community benefit This project will create a path that will primarily improve access to the primary school and offers a route for residents with mobility issues across the village green. This project benefits a greater number of residents when compared to other projects in the same category. |
Score |
4/6 |
|
Action on Climate Emergency The organisation has implemented multiple or regular minor events, activities or services that contribute to the Climate Emergency. They have not provided evidence of adoption of a sustainability/ climate action policy/statement for the organisation. |
Score |
3/6 |
|
Financial sustainability They have secured 50 per cent of the project costs already from their reserve capital and have budgeted for any ongoing costs and eventual replacement. The parish council have not provided a contingency plan should they only receive a partial grant from the council. Although the organisation is making a 50 per cent contribution, officers have removed two points as their bank account is healthy, suggesting they could make a greater contribution or fund the project themselves |
Score |
2/6 |
|
Themed criteria for chosen corporate plan priority The installation of a new pathway around the village green will help to promote the community’s physical wellbeing and helps to open up access to other village amenities in a sustainable way. This has not been scored against the Action on the Climate Emergency priority, however officers wish to note some concerns around the appropriateness of this project which is detrimental to the green space that would be lost to create the path. |
Score |
3/6 |
|
Officer Comments:
Financial and project management plans The project plans are sufficient and quotes have been carefully considered. A resin path has been selected to minimise ongoing maintenance as it is durable. This new pathway will link with an existing path installed on the village green and partially funded by SODC in 2019. Demand for services and other similar facilities The smooth level surface of the pathway will be particularly beneficial to residents with mobility issues or a visual impairment, and families with young children in pushchairs. It also provides a safer route to encourage more pupils to walk or cycle to school, the village hall, library, and community centre. Internal Consultation No S106 funds available. Equalities: Ensure width and surface of the new pathway meet accessibility guidelines to ensure it is inclusive for all. Project completion within timeframe With funding in place, the project could be completed within one month. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS Officers have been able to score this project well for Community Benefit as it is a path that will be used by families accessing the school and for people with mobility issues. It links with another path which was partially funded by the South Capital Grants scheme in 2019. Unfortunately, the project has scored as a low priority and therefore doesn’t meet the threshold for receiving a grant.
However, if the panel are minded to increase the scores based on further evidence, officers recommend funding is conditional on meeting accessibility standards for pathway widths and surfacing. |
Total score |
14/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
The new pathway will link up with the
primary school and go to the back of the village green with access
to The Close. |
|
Where will the project take place? |
Woodcote (S) |
|
Community Need, Inclusion and Consultation |
||
What extra facilities (or equipment) will the project provide? |
The project is for a new pathway around a part of the village green. Currently there is no pathway in the area specified in the design for this and it will enable easier and safer access to facilities for residents. |
|
What new activities will take place because of this project? |
The new activities will be that people will use the pathway to walk or cycle to schools, library, community centre, and village hall. |
|
How do you know there is a need for your project? |
When the PC installed a Zebra
Crossing there was a clear need for a pathway from that crossing
along the back of the Village Hall to link it to the schools and
other facilities. |
|
Community benefit |
||
Who will benefit from your project? |
All residents of Woodcote Village can benefit from the new pathway, Mothers taking children to school, older residents going for walks, residents with mobility issues will have a smooth level surface to use mobility scooters, wheelchairs to access facilities in the village. Younger children on bikes, scooters, roller skates. Visitors to the village can also benefit by using the pathway.
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
Yes, the pathway will certainly help elderly as it will be level and smooth with no trip hazards, likewise individuals with disabilities, people with impairments such as partially sighted or blind offering a safer level pathway suitable for a cane or guide dog. The pathway will link to an area with social housing to enable better access to walk to schools, encourage more families to use it with buggies/prams. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
Yes the Parish Council have this on
their agenda. They are mindful of all new developmentss in
the village considering carbon neutral construction where possible,
and have actively had discussions with developers, such items as
solar panels, heat source boilers, electric car charging
points. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
The choice of resin is due to its
extremely good flat surface and that ongoing maintenance is
minimal. Unlike tarmac it will not degrade down and crumble, cracks
are unusual and a very heavy weight would be needed to crack the
surface. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
The Parish Council has commitments for salaries, and ongoing activities within the village. However, these are already budgeted for in the Precept budget and there are funds to cover all these commitments. A detailed Receipt and Payment report can be provided. |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
The project will bring a "new"
pathway which currently does not exist. The aim is to
encourage more people to walk around the facility of the village
green, it will help more residents in particular anyone with
mobility issues or impairments. |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
The PC consulted with the Village Green Committee (a committee of the PC) for feedback which was positive. Also have received comments from residents to "join up" with the existing resin pathway installed a few years ago. |
|
Goring & Almshouses Bowls Club |
Ref |
SCAP21-22/75 |
||
Upgrade and expansion of bowling green |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 60 |
||||
|
||||
Total project cost |
£24,162 |
SCAP grant requested |
£9,000 |
|
Organisation's contribution |
£10,686 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£4,476 |
|
||
Funding still needed for the project |
£9,000 |
Organisation's latest bank balance £16,400.83 |
||
Previous community grants awarded: none
Scoring |
|||
Community need, inclusion and consultation The project significantly improves a minor community facility by extending and resurfacing the green at Goring Heath to enable the Club to compete in league matches. |
Score |
3/6 |
|
Community benefit Acknowledging that the facilities are also free to use by residents, staff and trustees of The Almshouses and occasionally by the Reading Partially Sighted Bowls group, it is a single sport, and as such can only score one point. A lower number of beneficiaries will be reached compared to other projects applying to the Capital Grant Scheme. |
Score |
1/6 |
|
Action on Climate Emergency The organisation has given some consideration into possible actions that address the Climate Emergency and they have implemented minor actions/ changes to the way they deliver their service, e.g, online communication and administration. |
Score |
2/6 |
|
Financial sustainability The Club has already secured all the other funding needed for the project. They have a contingency plan should they only receive a partial grant from the council. They have budgeted for maintenance costs however not for a replacement as they say it will not be required. |
Score |
5/6 |
|
Themed criteria for chosen corporate plan priority The facility provides better outcomes to the community, particularly improving the mental wellbeing and physical health of older residents with an interest in bowls. |
Score |
3/6 |
|
Officer Comments:
Financial and project management plans Sufficient financial and project management plans for upgrading and expanding a bowling green. They have secured over 60 per cent of the funding themselves. Demand for services and other similar facilities The Club is an amalgamation of Goring Bowls Club and Goring Heath Bowls Club. The applicant states that it is the only outdoor sporting activity available to senior citizens in the area. Internal Consultation No S106 funds available. Equalities: Ensure the expansion of bowling enables access for all including disabled people and mobility impaired. Project completion within timeframe The project is expected to commence August 2022 and take one month to complete. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS Officers have been able to score this project highly for financial sustainability due to the excellent fundraising efforts by the Club and the value that it has amongst its members. Unfortunately, the project has scored as a low priority and therefore doesn’t meet the threshold for receiving a grant.
|
Total score |
14/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
The Goring & Almshouses Bowls
Club was formed by the amalgamation of the Goring Bowling Club,
with a three rink green at The Gardener Recreation Ground in
Goring, and the Goring Heath Bowls Club (Almshouses), with a 3-rink
green at The Almshouses, Goring Heath. The amalgamated club
cannot afford to maintain two greens, so needs to hand the Goring
green back to the Parish Council, then improve and expand the green
at The Almshouses. This is because there is no room for
expansion at Goring and the lack of facilities at Goring. |
|
Where will the project take place? |
Goring Heath (S) |
|
Community Need, Inclusion and Consultation |
||
How do you know there is a need for your project? |
Bowls is a game which can be played
by anybody, from childhood to advanced old age. In
particular, it is the only outdoor sporting activity available to
senior citizens in our area, providing both physical excercise and
mental stimulation and companionship. The club benefits its
own members and is also available free to use by residents of The
Almshouses. In addition, it sometimes hosts the Reading
Partially Sighted Bowling Group. Since the demise of the
bowls clubs at Peppard and Wallingford, we are the only available
club in this part of South Oxfordshire. |
|
Community benefit |
||
Who will benefit from your project? |
- The 40 playing members of the
club.
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
The project will not change accessibility, but the club can only thrive in the long term with a green which is viable for match play. Whithout this project, there is danger of the facility being lost. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
The club always had a very low environmental footprint, being an outdoor activity not requiring any special buildings or equipment. We have reduced our paperwork impact by moving most of our communications online, so no longer print fixture cards or use paper forms for signing up to matches. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
- Minor contingencies will be covered
from club reserves, if necessary replenished by adjusting the
annual membership fee. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
We expect a bill from Goring Heath Parish Council for the permit to use the bowling green at Goring for the 2022 season. It is expected to be between £400 and £450, but will not affect our ability to contribute to this project as stated above. Over the winter season, we expect only small further outgoings (e.g. petrol for lawnmowers) before next year's membership fees are collected. |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
- Continued bowls play in the Goring
and Woodcote, Wallingford, Benson and Checkendon area of South
Oxfordshire. |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
The trustees of the Goring Heath Almshouses have collaborated extensively in obtaining planning permission for the green expansion on their land. |
|
Sonning Common and District Tennis Club |
Ref |
SCAP21-22/69 |
||
Tennis court resurfacing x 2 |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 425 |
||||
|
||||
Total project cost |
£31,777 |
SCAP grant requested |
£9,990 |
|
Organisation's contribution |
£20,000 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£0 |
|
||
Funding still needed for the project |
£11,777 |
Organisation's latest bank balance £20,692 |
||
Previous community grants awarded: none
Scoring |
|||
Community need, inclusion and consultation The project significantly extends the life of Sonning Common tennis courts by resurfacing the courts. Some consultation with the parish council and Lawn Tennis Association (LTA) has taken place. The LTA describes the facility as ‘a valuable asset’ to the community, a view further supported by SODC’s Local Leisure Facilities Study which identifies the need for more courts in the area. |
Score |
4/6 |
|
Community benefit Acknowledging the low cost memberships that are offered by the tennis club to attract families and lower income households, it is nevertheless a single sport, and as such can only score one point against the scoring criteria. A lower number of beneficiaries will be reached compared to other projects. |
Score |
1/6 |
|
Action on Climate Emergency The organisation has delivered one-off or minor events or activities that contribute to the Climate Emergency. They have considered minor future action but have not provided evidence of a sustainability/ climate action policy/statement for the organisation. |
Score |
2/6 |
|
Financial sustainability They have already secured 63 per cent of the total project cost. The remaining balance after a Capital grant will be met via future subscription income from the 2022 season, but this is not yet secured. The Club has budgeted for ongoing costs and has a general idea how they will fund replacements. There is no evidence of contingency funding should their application to SODC be unsuccessful or partially successful. |
Score |
4/6 |
|
Themed criteria for chosen corporate plan priority Increased usage of the courts will improve mental wellbeing and physical health. Some information regarding partnership working with Sonning Common Parish Council and Rotherfield Athletics has been provided. |
Score |
3/6 |
|
Financial and project management plans The project plans are sufficient for resurfacing two tennis courts. The organisation's bank balance is a little over £20,000, therefore, £20,000 of their own contribution may leave the Club financially vulnerable. Should their application be unsuccessful or partially successful, the project could be in jeopardy as they have not applied for other funds. The applicant also raises the resurfacing as a potential health and safety issue within a couple of years if the work is not done, leading to potential closure of the site. Demand for services and other similar facilities Over 400 local residents use the courts to play affordable informal tennis and its value is recognised by the LTA and Sonning Common Parish Council. With the increase in planned housing in the area, it is thought this demand will rise. Internal Consultation No S106 funds are available. Equalities: Ensure inclusive access onto the tennis court i.e. for wheelchair users. It is recognised this may need to be done in phases, due to the lack of a paved access route and being unable to replace the surrounding fencing as part of this project. Leisure: The South Oxfordshire Local Leisure Facilities Study states that there is a need for six more courts in the Shiplake/Sonning Common area, so if these courts are not resurfaced, and future use by the community is lost, there will be an even greater deficit. Project completion within timeframe With funding in place, the 26 September 2022 start date is possible, with completion 21 October 2022 |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS Officers have been able to give this project a good score for Community Need, also scoring well against corporate plan priorities. There is a clear need for these tennis courts to be maintained for public use, a position reinforced by the council’s leisure strategy. Unfortunately, the project has scored as a low priority and therefore doesn’t meet the threshold for receiving a grant.
However, if the panel are minded to increase the scores based on further evidence, officers would need reassurance that the organisation can afford to make the contribution it has earmarked without putting their Club in financial difficulties.
|
Total score |
14/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
The surface of the two tennis courts the Club plays on are beginning to fail. They were last replaced 21 years ago so we have done well. Although not currently dangerous they must be resurfaced in the next two years otherwise accidents may occur. The courts are a valuable asset of the community (described as such by the LTA) in that they make tennis accessible for the community. This is because we deliberately keep our subscriptions as low as possible to encourage families to play. Currently subscriptions for a family of say five is £40 per annum whereas local ‘normal’ tennis clubs charge circa £200 per person per annum. Obviously these other tennis clubs offer greater facilities (changing rooms, league teams, etc) and address the needs of the more experienced and able players. Consequently we provide an affordable entry level into informal tennis. This is readily demonstrated by the fact that we currently have over 100 families as members with, we are certain, more to join following local housing developments. |
|
Where will the project take place? |
Sonning Common (S) |
|
Community Need, Inclusion and Consultation |
||
How do you know there is a need for your project? |
The two tennis courts provide
affordable tennis to over 100 families in the Sonning Common area.
As previously mentioned, the £40 family membership allows
local residents access to affordable tennis and compares very
favourably to individual membership of circa £200 per person
elsewhere in South Oxfordshire. As a result the LTA regard our
courts as a very valuable asset to the community. Sonning Common
Parish Council similarly regard the
courts as valuable assets allowing over 400 local residents the
ability to play affordable informal tennis. With the increase in
planned housing in the area, this demand can only rise. |
|
Community benefit |
||
Who will benefit from your project? |
Tennis was identified by the Sonning
Common PC as an important offering when considering the facilities
at the new Memorial Hall Fields. Due to the ongoing maintenance the
SCPC decided that the tennis offering would best be met by the
Sonning Common Tennis Club. This would remove the requirement to
put up and take down the nets on any multi-use facility at the new
Memorial Hall Field site.
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
As the courts are on a level site, it
is already accessible by individuals with disabilities. That said,
the Club will be considering installing a paved access route in the
near future. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
Members of the Club planted 160 hedge
saplings in the area surrounding the courts in 2019. These are now
thriving and will be encouraged to merge and so provide shelter and
a food source for local wildlife. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
The annual rent of the courts and maintenance costs together with occasional moss treatment, repainting and tree surgery will be met from annual subscriptions as will future plans to replace the fencing. It would have been ideal to have had the fencing replaced at the same time as the resurfacing but this would increase the total bill to £46,500. At the moment the Club would be unable to meet the 50% condition. Consequently as the fencing is considered to be currently sound, it’s replacement will be considered in the next few years. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
There are no financial commitments. These have all been met. |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
The key deliverable is safe tennis courts that local residents can use to play affordable informal tennis for the next 20 plus years. As it is a primary aim of the Club to provide affordable tennis, subscriptions will always be kept low thus making our Club accessible to the wider community. |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
We have a good relationship with Rotherfield United Football Club (the owners of Bishopswood Sports Ground) and often join them in maintenance of the wider site when asked. |
|
Berinsfield Information and Volunteer Centre (BIVC) |
Ref |
SCAP21-22/49 |
||
Upgrade printer |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 3,250 |
||||
|
||||
Total project cost |
£5,885 |
SCAP grant requested |
£2,942.50 *adjusted from £5,885 |
|
Organisation's contribution |
£545 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£0 |
Organisation requested 100% of total project cost. Max permitted 50% |
||
Funding still needed for the project |
£5,340 |
Organisation's latest bank balance £28,867 (£31,520 as evidenced from bank statements) |
||
Previous community grants awarded: Capital Grant - Equipment upgrade £10,400 (2014) SRev\46 – Four-year revenue funding £67,452 (2017-2021) SEAG/23 - Covid Community Response £3,500 (2020)
Scoring |
|||
Community need, inclusion and consultation The project is replacing an office printer with minor upgrades, used to produce the local village newsletter as well as day-to-day administration. It will allow existing activities to continue. |
Score |
1/6 |
|
Community benefit Printing of the village newsletter promotes social cohesion to help vulnerable people in Berinsfield access services and information. It benefits a greater number of residents when compared to other projects in the same category. |
Score |
4/6 |
|
Action on Climate Emergency The organisation has given some consideration into possible future actions that address the Climate Emergency, with limited evidence of any actions already undertaken. |
Score |
1/6 |
|
Financial sustainability BIVC don’t have a plan for how they will fund the rest of the project. They have requested more than 50 per cent of the total project cost in error, which is above the maximum the scheme allows. They have however budgeted for ongoing maintenance. |
Score |
0/6 |
|
Themed criteria for chosen corporate plan priority BIVC’s new printer will help to reduce rural isolation through the printing of the village newsletter and allows the centre to continue providing essential information and advice services to the community. It will not however result in a new activity or service. |
Score |
2/6 |
|
Officer Comments:
Financial and project management plans BIVC’s request has been adjusted to fit with the scheme’s criteria of awarding up to 50 per cent of the project costs. This has had an impact on the scoring of their funding and project management plans. BIVC say they have limited funds to contribute to the purchase of a new printer. Demand for services and other similar facilities This project has one of the highest number of indirect beneficiaries compared to other projects in the same category. BIVC offers their valuable information and advice services to all residents in Berinsfield, particularly those in priority groups including the elderly and isolated young families, and works in partnership with other complementary organisations. Internal Consultation No S106 funds available for this project. Project completion within timeframe Officers are confident that that project would be completed within the 12 month timeframe, providing the organisation is able to secure additional funds. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS Officers have been able to score this project well for Community Benefit due to the important role that BIVC has in offering advice and sharing essential information with residents. Unfortunately, the project has scored low in other areas, and therefore does not meet the threshold for receiving a grant.
|
Total score |
8/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
Our printer is around 10 years old and is becoming very unreliable. BIVC uses the printer to produce the local newsletter (Village Voice) which requires a facility to fold and staple the document and at times requires colour printing. BIVC also uses the printer for its daily services which involves copying letters, printing posters, government forms and clients who use the printer for a small fee. The printer is an essential part of our working life and its unreliability is becoming problematical. |
|
Where will the project take place? |
Berinsfield (S) |
|
Community Need, Inclusion and Consultation |
||
How do you know there is a need for your project? |
BIVC produces the much needed Village
Voice which is distributed to every house on the village The
newsletter covers events, local business adverts and other village
requirements (such as Church) and includes a contribution from the
local councillor's and the Parish Council. SODC also takes
advantage of the Village Voice to produce articles which cover all
of the village residents. It is becoming more and more
difficult to produce the Village Voice efficiently and it is also
causing a problem with some of our services which require
photocopying, such as DWP forms. |
|
Community benefit |
||
Who will benefit from your project? |
BIVC works closely with other village organisations such as Berin Centre (who work with families), Health Centre who refer clients to us, Youth Club, School, SOHA, Church and Parish Council and any other organisations who require our assistance. BIVC also works with the Wallingford Food Bank, we hold a supply of food for emergencies (people whose benefit has been cut, clients who are coming out of an abusive relationship or any other sudden emergency), we worked with SODC during the pandemic and are a hub for the Voucher Scheme. We offer a printing service for any organisations that requires it.
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
BIVC works with the elderly and acts as an intermediary when they are unable to talk to other agencies, such as SOHA or utility companies. BIVC also run a coffee morning and other events to offer a means of inclusion to the elderly and young families The printer would enable us to produce and print relevant posters. BIVC offers a one-to-one service for non-english speakers and help with literacy problems within the village by means of reading and explaining letters, and work with people who have both mental and physical disabilities to access government benefits; this entails printing of forms to provide a record. BIVC works with the homeless by collaborating with Aspire who provide the additional services. This can be by providing a place where they can interview their clients and we provide other services as necessary. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
We will look at offering our staff
Climate Change training in the New Year, also change the way we
recycle within our office. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
BIVC will enter into a maintenance contract with Swift to ensure that the printer is kept in good running order. The cost of this will be met from our general income. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
BIVC has limited funds which are used
to keep the centre running. Our estimated income as evidenced
in the accompanying form are insufficient to allow us to contribute
to the purchase of a new printer. The income from all our
fund raising efforts is consumed in the daily running of the centre
and provision of our services. The overall budget for 2022/23 is
£43,579, and includes salaries, rent, utilities and office
costs. |
|
What difference will your project make in your community? |
Improved economic and community
wellbeing |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
A new printer will enable us to continue to provide the relevant information from various agencies within/outside the community to the villagers and surrounding areas. |
|
ASTON ROWANT PARISH COUNCIL |
Ref |
SCAP21-22/52 |
||
Parish noticeboards |
||||
Corporate plan priority: Improved economic and community wellbeing |
||||
Potential number of beneficiaries: 500 |
||||
|
||||
Total project cost |
£6,563 |
SCAP grant requested |
£3,281.50* adjusted from £5,000 |
|
Organisation's contribution |
£1,500 |
Total other funding applied for but not yet secured |
£0 |
|
Other secured funding |
£0 |
*Organisation requested 76% of total project cost. Max permitted 50% |
||
Funding still needed for the project |
£5,063 |
Organisation's latest bank balance £44,609.49 (£31,992 as evidenced from bank statements) |
||
Previous community grants awarded: none
Scoring |
|||
Community need, inclusion and consultation This project is to purchase three wooden parish noticeboard with like-for-like replacements. |
Score |
1/6 |
|
Community benefit The noticeboards will provide a public space to display parish information for parishioners who are mobile but not able to access the same information online and for visitors from outside the parish. |
Score |
3/6 |
|
Action on Climate Emergency The organisation has given some consideration into possible actions that address the Climate Emergency, with limited evidence of any actions undertaken. They have submitted a draft Climate Emergency Policy (this is due to be updated following COP26, and a resolution passed to formally adopt). |
Score |
1/6 |
|
Financial sustainability Aston Rowant Parish Council have requested more than 50 per cent of the total project cost, which exceeds the maximum allowed and have therefore not applied elsewhere for the remaining funds needed. They have budgeted for ongoing maintenance and have a contingency plan should they only receive a partial grant from the council, but do not say how they will fund eventual replacements. |
Score |
1/6 |
|
Themed criteria for chosen corporate plan priority The project contributes to the theme but in a very minor way compared to other projects for this round of funding. More detail/information is needed to demonstrate the project would have a much bigger impact. |
Score |
0/6 |
|
Officer Comments:
Financial and project management plans Aston Rowant’s request has been adjusted to fit within the scheme’s criteria of awarding up to 50 per cent of the project costs. The organisation’s bank balance suggests they could fund the whole project without funding, however they have chosen to prioritise other projects. In light of the health and safety issue referred to below, officers recommend this should be a priority and have removed two points. Demand for services and other similar facilities There are existing noticeboards in the village which are used to display the Parish Council’s statutory notices and information, however they have not been maintained and one is now a health and safety issue. Internal Consultation No S106 funds are available. Project completion within timeframe Officers are confident that that project would be completed within the 12 month timeframe, providing the organisation is able to secure all the funds. |
|||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS Officers recognise the importance of parish noticeboards for sharing essential information with residents and visitors to the area. However, the overall score for the project makes it a low priority for funding and therefore doesn’t meet the threshold for receiving a grant. |
Total score |
6/30 |
|
Recommended Grant |
Amount to be confirmed at the panel meeting |
||
|
|
|
|
Applicant responses |
||
Details of the project |
All three existing wooden parish
noticeboards, upon which we are legally obligated to display
certain information, have suffered badly from the affects of
weather and neglect over the years with the result that during the
COVID lockdowns over the last 18 months one has become completely
unusable and one is in danger of toppling over. |
|
Where will the project take place? |
Aston Rowant (S) |
|
Community Need, Inclusion and Consultation |
||
How do you know there is a need for your project? |
As described on previous pages, the current noticeboards are all unfit for purpose |
|
Community benefit |
||
Who will benefit from your project? |
All parishioners - they will have
access to details of all the up-to-date activities of the Parish
Council. We have a large proportion of elderly non-tech savvy
parishioners who are uncomfortable with using the website and the
Parish Magazine is only produced bi-monthly so some information is
out of date by the time published.
|
|
Have you considered how your project will benefit vulnerable & disadvantaged residents? |
As above. |
|
Action on Climate Emergency |
||
Has your organisation taken any steps to improve its own environmental sustainability? |
The draft Climate Emergency Policy - will need to be updated following COP26, and a resolution passed to formally adopt, but it is something we are keen to promote. |
|
Financial sustainability |
||
What are the ongoing financial requirements for this project once the delivery is complete? |
None, maintenance costs will be built into the 2022-23 budget calculations. |
|
Please give us detail of any existing financial commitments that affect how much you can contribute to this project? |
1) We need to upgrade or replace
equipment in our childrens play area. |
|
Project theme – outcomes |
||
What difference will your project make in your community? |
As detailed on previous pages. |
|
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. |
None so far, but if this application is unsuccessful we have a number of organisations we can approach, although they are not specifically set up for this kind of project. |
|